EV charging stations in Weyarn
22 public charging sites with 25 charge points are registered in Weyarn, including 16 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 250 kW.
The largest operator is Tesla Germany GmbH with 16 charge points; 6 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Weiglfeld 26, 83629 WeyarnDirections
Other charging sites
AC charge points, sorted by number of points.
- Miesbacher Str 2, 83629 WeyarnDirections
- Ignaz-Günther-Str. 0, 83629 WeyarnDirections
- Am Weiglfeld 32, 83629 WeyarnDirections
- Neukirchner Straße 21, 83629 WeyarnDirections
- Ehgart 4, 83629 WeyarnDirections
Recently opened
- 21 Jun 2023 · Miesbacher Str 2 · 22 kW · Alter Wirt Weyarn Hotel und Gaststätten Betriebs GmbHmeyer@a
- 20 Apr 2023 · Am Weiglfeld 26 · 250 kW · Tesla Germany GmbH
- 1 Jan 2023 · Am Weiglfeld 32 · 11 kW · niebo-energy
- 21 Sept 2022 · Neukirchner Straße 21 · 12 kW · Kilian Westner
- 21 Sept 2022 · Ehgart 4 · 11 kW · Rudolf Huber
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Holzkirchen 110
- Irschenberg 36
- Miesbach 34
- Gmund am Tegernsee 33
Data: official national charge point register (1 September 2026). Data sources