Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Miesbach · Bayern · Germany

EV charging stations in Holzkirchen

65 public charging sites with 110 charge points are registered in Holzkirchen, including 26 DC fast-charging points and 23 delivering at least 150 kW. The most powerful points deliver up to 350 kW.

The largest operator is Robert Bosch GmbH with 50 charge points; 13 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites65
Charge points110
DC fast points26
150 kW and up23

Charge points by power

≤ 11 kW2
12–22 kW83
23–49 kW0
50–149 kW2
≥ 150 kW23

Operators

Robert Bosch GmbH50
MER Germany12
Gemeindewerke Holzkirchen GmbH12
IONITY GmbH10
Tesla Germany GmbH8
Aral Pulse4
Autohaus Fellner GmbH & Co. KG4
Hans Steingraber GmbH & Co. KG3
EnBW mobility+ AG und Co.KG2
E.ON Drive GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Holzkirchen Nord 0
    IONITY GmbH350 kW4 pointsCCS
    Directions
  • Holzkirchen Süd 0
    IONITY GmbH350 kW4 pointsCCS
    Directions
  • Schmiedstr. 16, 83607 Holzkirchen
    IONITY GmbH350 kW2 pointsCCS24/7
    Directions
  • Miesbacher Str. 33, 83607 Holzkirchen
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Rosenheimer Str. 21, 83607 Holzkirchen
    Tesla Germany GmbH250 kW8 pointsCCS
    Directions
  • Holzkirchen BAB 8 BAB 8
    E.ON Drive Infrastructure160 kW1 pointsCCS, CHAdeMO24/7
    Directions
  • Raststätte Holzkirchen Nord 0
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Münchner Straße 105, 83607 Holzkirchen
    Autohaus Fellner GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions
  • Münchner Str. 105, 83607 Holzkirchen
    Autohaus Fellner GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bergfeldstraße 2, 83607 Holzkirchen
    Robert Bosch GmbH22 kW50 pointsType 2
    Directions
  • Robert-Bosch-Str. 1, 83607 Holzkirchen
    Hans Steingraber GmbH & Co. KG22 kW3 pointsType 2
    Directions
  • Herdergarten 0, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Industriestrasse 0, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Baumgartenstraße 0, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Thannerstrasse 0, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Marienstrasse 0, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Herdergarten 2, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Marktplatz 2, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Thannerstr. 6, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Industriestr. 51, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Tölzer Str. 135, 83607 Holzkirchen
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Baumgartenstr. 2a, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Baumgartenstrasse 7B, 83607 Holzkirchen
    MER Germany22 kW2 pointsType 2
    Directions
  • Baumgartenstr. 7b, 83607 Holzkirchen
    Gemeindewerke Holzkirchen GmbH22 kW2 pointsType 2
    Directions
  • Austraße 20, 83607 Holzkirchen
    Thomas Jacob11 kW1 pointsType 2
    Directions
  • Meilerstraße 14, 83607 Holzkirchen
    IB NEWS GmbH2 kW1 pointsType 2
    Directions

Recently opened

  • 28 Feb 2026 · Bergfeldstraße 2 · 22 kW · Robert Bosch GmbH
  • 19 Dec 2024 · Schmiedstr. 16 · 350 kW · IONITY GmbH
  • 1 Jan 2024 · Meilerstraße 14 · 2 kW · IB NEWS GmbH
  • 15 Jun 2023 · Rosenheimer Str. 21 · 250 kW · Tesla Germany GmbH
  • 13 Feb 2023 · Tölzer Str. 135 · 22 kW · E.ON Drive GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out