Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Meurthe-et-Moselle · France

EV charging stations in Maidières

9 public charging sites with 26 charge points are registered in Maidières, including 8 DC fast-charging points. The most powerful points deliver up to 22 kW.

The largest operator is Freshmile France with 26 charge points.

At home, the regulated base tariff is €0.200/kWh per kWh, and €0.136/kWh in off-peak hours on a blue Tempo day – about €2.31 for 100 km at 17 kWh.

Sites9
Charge points26
DC fast points8
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW26
23–49 kW0
50–149 kW0
≥ 150 kW0

Operators

Freshmile France26

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Place Saint-Antoine, Pont-à-Mousson 54700 France
    Freshmile France22 kW4 pointsCCS, domestic socket, Type 224/7
  • 59 Rue 26e Bataillon de Chasseurs à Pieds, Pont-à-Mousson 54700 France
    Freshmile France22 kW2 pointsCCS, domestic socket, Type 224/7
  • Rue Philippe de Gueldre, Pont-à-Mousson 54700 France
    Freshmile France22 kW2 pointsCCS, domestic socket, Type 224/7
  • L'Île d'Esch, Pont-à-Mousson 54700 France
    Freshmile France22 kW2 pointsCCS, domestic socket, Type 224/7

Other charging sites

AC charge points, sorted by number of points.

  • Square Henri Dunant, Pont-à-Mousson 54700 France
    Freshmile France22 kW8 pointsdomestic socket, Type 224/7
  • 18 Rue de Blénod, Maidières 54700 France
    Freshmile France22 kW4 pointsdomestic socket, Type 224/7
  • 2 Allée de l'Espace Saint-Martin, Pont-à-Mousson 54700 France
    Freshmile France22 kW2 pointsdomestic socket, Type 224/7
  • Place du Paradis, Pont-à-Mousson 54700 France
    Freshmile France22 kW2 pointsdomestic socket, Type 224/7

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (15 October 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET