EV charging stations in Altenburg
26 public charging sites with 53 charge points are registered in Altenburg, including 24 DC fast-charging points and 11 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Stadtwerke Altenburg GmbH with 22 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Rudolf-Breitscheid-Str. 45, 04600 AltenburgDirections
- Keplerplatz 5, 04600 AltenburgDirections
- Leipziger Straße 89, 04600 AltenburgDirections
- Leipziger Str. 112, 04600 AltenburgDirections
- Zwickauer Str 60, 04600 AltenburgDirections
- Pohlhofgasse 7, 04600 AltenburgDirections
- Käthe-Kollwitz-Str. 43, 04600 AltenburgDirections
- Leipziger Str. 89a, 04600 AltenburgDirections
- Leipziger Straße 89a 89, 04600 AltenburgDirections
Other charging sites
AC charge points, sorted by number of points.
- Am kleinen Teich 0, 04600 AltenburgDirections
- Franz-Mehring-Straße 0, 04600 AltenburgDirections
- Kornmarkt 1, 04600 AltenburgDirections
- Am Weißen Berg 1, 04600 AltenburgDirections
- Brühl 3, 04600 AltenburgDirections
- Birkenstraße 6, 04600 AltenburgDirections
- Albert-Levy-Straße 7, 04600 AltenburgDirections
- Am Steinweg 12, 04600 AltenburgDirections
- Wettinerstraße 15, 04600 AltenburgDirections
- Schmöllnsche Straße 31, 04600 AltenburgDirections
- Albert-Levy-Str. 61, 04600 AltenburgDirections
- Buchenring 19, 04600 AltenburgDirections
- Buchenring 19/29, 04600 AltenburgDirections
Recently opened
- 12 Jun 2026 · Rudolf-Breitscheid-Str. 45 · 300 kW · ADS-TEC Energy Service GmbH
- 23 May 2025 · Leipziger Str. 112 · 150 kW · POTR
- 22 Apr 2025 · Käthe-Kollwitz-Str. 43 · 60 kW · Kaufland
- 14 Jan 2025 · Leipziger Str. 89a · 50 kW · Allego
- 9 Apr 2024 · Birkenstraße 6 · 22 kW · Stadtwerke Altenburg GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Schmölln 37
- Borna 39
- Meerane 39
- Glauchau 49
- Zeitz 49
- Pegau 34
- Gera 239
- Limbach-Oberfrohna 74
- Zwickau 457
- Markkleeberg 80
- Grimma 63
- Kraftsdorf 26
Data: official national charge point register (1 September 2026). Data sources