Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Altenburger Land · Thüringen · Germany

EV charging stations in Altenburg

26 public charging sites with 53 charge points are registered in Altenburg, including 24 DC fast-charging points and 11 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Altenburg GmbH with 22 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points53
DC fast points24
150 kW and up11

Charge points by power

≤ 11 kW0
12–22 kW24
23–49 kW0
50–149 kW12
≥ 150 kW17

Operators

Stadtwerke Altenburg GmbH22
Allego10
Comfort Charge4
POTR4
AreaCharge4
Kaufland3
ADS-TEC Energy Service GmbH2
Hercher Die Service Familie GmbH2
VR-Bank Altenburger Land eG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Rudolf-Breitscheid-Str. 45, 04600 Altenburg
    ADS-TEC Energy Service GmbH300 kW2 pointsCCS24/7
    Directions
  • Keplerplatz 5, 04600 Altenburg
    Comfort Charge150 kW4 pointsCCS, Type 2
    Directions
  • Leipziger Straße 89, 04600 Altenburg
    Allego150 kW4 pointsCCS
    Directions
  • Leipziger Str. 112, 04600 Altenburg
    POTR150 kW4 pointsCCS, CHAdeMO24/7
    Directions
  • Zwickauer Str 60, 04600 Altenburg
    Stadtwerke Altenburg GmbH150 kW3 pointsCCS, Type 2
    Directions
  • Pohlhofgasse 7, 04600 Altenburg
    Stadtwerke Altenburg GmbH100 kW3 pointsCCS, Type 2
    Directions
  • Käthe-Kollwitz-Str. 43, 04600 Altenburg
    Kaufland60 kW3 pointsCCS, Type 224/7
    Directions
  • Leipziger Str. 89a, 04600 Altenburg
    Allego50 kW4 pointsCCS24/7
    Directions
  • Leipziger Straße 89a 89, 04600 Altenburg
    Allego50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am kleinen Teich 0, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Franz-Mehring-Straße 0, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Kornmarkt 1, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Am Weißen Berg 1, 04600 Altenburg
    Hercher Die Service Familie GmbH22 kW2 pointsType 2
    Directions
  • Brühl 3, 04600 Altenburg
    VR-Bank Altenburger Land eG22 kW2 pointsType 2
    Directions
  • Birkenstraße 6, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Albert-Levy-Straße 7, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Am Steinweg 12, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Wettinerstraße 15, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Schmöllnsche Straße 31, 04600 Altenburg
    Stadtwerke Altenburg GmbH22 kW2 pointsType 2
    Directions
  • Albert-Levy-Str. 61, 04600 Altenburg
    AreaCharge22 kW2 pointsType 224/7
    Directions
  • Buchenring 19, 04600 Altenburg
    AreaCharge22 kW1 pointsType 224/7
    Directions
  • Buchenring 19/29, 04600 Altenburg
    AreaCharge22 kW1 pointsType 224/7
    Directions

Recently opened

  • 12 Jun 2026 · Rudolf-Breitscheid-Str. 45 · 300 kW · ADS-TEC Energy Service GmbH
  • 23 May 2025 · Leipziger Str. 112 · 150 kW · POTR
  • 22 Apr 2025 · Käthe-Kollwitz-Str. 43 · 60 kW · Kaufland
  • 14 Jan 2025 · Leipziger Str. 89a · 50 kW · Allego
  • 9 Apr 2024 · Birkenstraße 6 · 22 kW · Stadtwerke Altenburg GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET