Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Bayreuth · Bayern · Germany

EV charging stations in Bindlach

23 public charging sites with 33 charge points are registered in Bindlach, including 18 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is E.ON Drive Infrastructure with 12 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points33
DC fast points18
150 kW and up16

Charge points by power

≤ 11 kW8
12–22 kW7
23–49 kW0
50–149 kW2
≥ 150 kW16

Operators

E.ON Drive Infrastructure12
Pross & Schick GmbH6
Jakob Immobilien GmbH& Co KG5
EnBW mobility+ AG und Co.KG4
Pariamus4
Schneidermarkt GmbH & Co.KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Esbachgraben 10, 95463 Bindlach
    E.ON Drive Infrastructure400 kW12 pointsCCS24/7
    Directions
  • Bühlstraße 14, 95463 Bindlach
    EnBW mobility+ AG und Co.KG300 kW4 pointsCCS
    Directions
  • Esbachgraben 7, 95463 Bindlach
    Pariamus50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Im Letterer 6, 95463 Bindlach
    Pross & Schick GmbH11 kW6 pointsType 2
    Directions
  • Esbachgraben 7, 95463 Bindlach
    Jakob Immobilien GmbH& Co KG22 kW5 pointsType 2
    Directions
  • Leuschnitzstr. 4b, 95463 Bindlach
    Schneidermarkt GmbH & Co.KG22 kW2 pointsType 2
    Directions
  • Lehengraben 4, 95463 Bindlach
    Pariamus11 kW2 pointsType 2
    Directions

Recently opened

  • 26 Feb 2026 · Esbachgraben 10 · 400 kW · E.ON Drive Infrastructure
  • 4 Apr 2024 · Lehengraben 4 · 11 kW · Pariamus
  • 18 Dec 2023 · Esbachgraben 7 · 50 kW · Pariamus
  • 6 Apr 2023 · Esbachgraben 7 · 22 kW · Jakob Immobilien GmbH& Co KG
  • 21 Dec 2022 · Bühlstraße 14 · 300 kW · EnBW mobility+ AG und Co.KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET