Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Goslar · Niedersachsen · Germany

EV charging stations in Braunlage

19 public charging sites with 33 charge points are registered in Braunlage, including 6 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is Punkt & Komma GmbH & Co. KG with 12 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites19
Charge points33
DC fast points6
150 kW and up0

Charge points by power

≤ 11 kW7
12–22 kW20
23–49 kW0
50–149 kW6
≥ 150 kW0

Operators

Punkt & Komma GmbH & Co. KG12
TEAG Mobil GmbH6
Wattif Europe GmbH4
Klinik Dr. Barner gGmbH4
GreenVesting GmbH & Co. KG2
Harz Energie GmbH & Co. KG2
Gruppenhäuser Lehmann2
Nicole und Timo Weckman Grundstücksgemeinschaft GbR1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Große Wurmbergstr. 4, 38700 Braunlage
    TEAG Mobil GmbH50 kW4 pointsCCS24/7
    Directions
  • Herzog-Johann-Albrecht-Str. 2, 38700 Braunlage
    GreenVesting GmbH & Co. KG50 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Jermerstein 15-19, 38700 Braunlage
    Punkt & Komma GmbH & Co. KG22 kW12 pointsType 2
    Directions
  • Karl-Röhrig-Str. 5a, 38700 Braunlage
    Wattif Europe GmbH22 kW4 pointsType 224/7
    Directions
  • Dr.-Barner-Str. 1, 38700 Braunlage
    Klinik Dr. Barner gGmbH11 kW4 pointsType 2
    Directions
  • Hindenburgstr. 1, 38700 Braunlage
    TEAG Mobil GmbH22 kW2 pointsType 2
    Directions
  • Am Amtsweg 5, 38700 Braunlage
    Harz Energie GmbH & Co. KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Bodestraße 10, 38700 Braunlage
    Gruppenhäuser Lehmann11 kW2 pointsType 2
    Directions
  • Schützenstr. 3, 38700 Braunlage
    Nicole und Timo Weckman Grundstücksgemeinschaft GbR11 kW1 pointsType 224/7
    Directions

Recently opened

  • 1 Jan 2026 · Dr.-Barner-Str. 1 · 11 kW · Klinik Dr. Barner gGmbH
  • 11 Feb 2025 · Große Wurmbergstr. 4 · 50 kW · TEAG Mobil GmbH
  • 12 Jun 2023 · Schützenstr. 3 · 11 kW · Nicole und Timo Weckman Grundstücksgemeinschaft GbR
  • 26 May 2023 · Karl-Röhrig-Str. 5a · 22 kW · Wattif Europe GmbH
  • 19 Dec 2022 · Am Jermerstein 15-19 · 22 kW · Punkt & Komma GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET