EV charging stations in Donauwörth
65 public charging sites with 124 charge points are registered in Donauwörth, including 29 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Airbus Helicopters Deutschland GmbH with 42 charge points; 18 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Dillinger Str. 22, 86609 DonauwörthDirections
- Kaiser-Karl-Str. 2, 86609 DonauwörthDirections
- Artur-Proeller-Str. 11, 86609 DonauwörthDirections
- Rosenstraße 12, 86609 DonauwörthDirections
- Dr.-Friedrich-Drechsler-Str. 1, 86609 DonauwörthDirections
- Alte Augsburger Straße 2, 86609 DonauwörthDirections
- Ludwig-Auer-Straße 2, 86609 DonauwörthDirections
- An der Westspange 4, 86609 DonauwörthDirections
- Adolph-Kolping-Str. 32, 86609 DonauwörthDirections
- Neurieder Weg 33, 86609 DonauwörthDirections
- Nürnberger Str. 20, 86609 DonauwörthDirections
Other charging sites
AC charge points, sorted by number of points.
- Industriestr. 4, 86609 DonauwörthDirections
- Dr.-Ludwig-Bölkow-Str. 2, 86609 DonauwörthDirections
- Sternschanzenstr. 1, 86609 DonauwörthDirections
- Rosenstr. 12, 86609 DonauwörthDirections
- Artur-Proeller-Str. 1, 86609 DonauwörthDirections
- Dr.-Ludwig-Bölkow-Str. 1, 86609 DonauwörthDirections
- Bahnhofstraße 29, 86199 DonauwörthDirections
- Bahnhofstr. 29, 86609 DonauwörthDirections
- Klostergasse 5, 86609 DonauwörthDirections
- Neudegger Allee 6, 86609 DonauwörthDirections
- Gartenstr. 15, 86609 DonauwörthDirections
- Gartenstraße 18, 86609 DonauwörthDirections
- Adolph-Kolping-Str. 32, 86609 DonauwörthDirections
- Dr.-Ludwig-Bölkow-Straße 2, 86609 DonauwörthDirections
- Zollernweg 2, 86609 DonauwörthDirections
- Graf-Hartmann-Str. 11, 86609 DonauwörthDirections
- Manasserstraße 22, 86609 DonauwörthDirections
- Bürgermeister-Rusch-Straße 7a, 86609 DonauwörthDirections
Recently opened
- 10 Nov 2025 · Zollernweg 2 · 11 kW · Wirelane GmbH
- 21 Oct 2025 · Ludwig-Auer-Straße 2 · 150 kW · EnBW mobility+ AG und Co.KG
- 6 May 2025 · Dillinger Str. 22 · 400 kW · Pfalzwerke AG
- 17 Feb 2025 · Kaiser-Karl-Str. 2 · 200 kW · energie schwaben gmbh
- 7 Feb 2025 · Graf-Hartmann-Str. 11 · 11 kW · cocharge
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
Data: official national charge point register (1 September 2026). Data sources