EV charging stations in Nördlingen
27 public charging sites with 60 charge points are registered in Nördlingen, including 18 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is EnBW ODR AG with 28 charge points; 11 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Würzburger Str. 3, 86720 NördlingenDirections
- Augsburger Straße 50, 86720 NördlingenDirections
- Markham-Str. 4, 86720 NördlingenDirections
- An der Reimlinger Mauer 28, 86720 NördlingenDirections
- Raiffeisenstr. 4, 86720 NördlingenDirections
- Hofer Str. 10, 86720 NördlingenDirections
- Augsburger Str. 65, 86720 NördlingenDirections
- Bleichgraben 3, 86720 NördlingenDirections
Other charging sites
AC charge points, sorted by number of points.
- Innerer Ring 0, 86720 NördlingenDirections
- Nähermemminger Weg 2, 86720 NördlingenDirections
- Bürgermeister-Reiger-Straße 7, 86720 NördlingenDirections
- Luntenbuck 9, 86720 NördlingenDirections
- Marktplatz 2, 86720 NördlingenDirections
- Stoffelsberg 4, 86720 NördlingenDirections
- Kerschensteiner Straße 4, 86720 NördlingenDirections
- Kerschensteiner Straße 4, 86720 NördlingenDirections
- Maria-Penn-Straße 5, 86720 NördlingenDirections
- Anton-Jaumann-Industriepark 6, 86720 NördlingenDirections
- Augsburger Str. 19, 86720 NördlingenDirections
- Augsburger Str. 50, 86720 NördlingenDirections
- Markham-Straße 4, 86720 NördlingenDirections
- Angergwand 27, 86720 NördlingenDirections
Recently opened
- 25 Sept 2025 · Anton-Jaumann-Industriepark 6 · 22 kW · EnBW ODR AG
- 3 Jul 2025 · Augsburger Str. 65 · 60 kW · Lidl
- 27 Mar 2025 · Luntenbuck 9 · 22 kW · Wattif Europe GmbH
- 11 Dec 2024 · Markham-Str. 4 · 150 kW · BayWa Mobility Solutions GmbH
- 11 Dec 2024 · Augsburger Str. 19 · 22 kW · EnBW ODR AG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Donauwörth 124
- Wemding 25
- Bopfingen 26
- Ellwangen (Jagst) 79
- Dinkelsbühl 74
- Ellwangen 30
- Dillingen a.d.Donau 29
- Oberkochen 51
- Aalen 127
- Heidenheim an der Brenz 37
- Heidenheim 59
- Buttenwiesen 26
Data: official national charge point register (1 September 2026). Data sources