Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Erding · Bayern · Germany

EV charging stations in Dorfen

28 public charging sites with 59 charge points are registered in Dorfen, including 34 DC fast-charging points and 28 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is EnBW mobility+ AG und Co.KG with 18 charge points; 10 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites28
Charge points59
DC fast points34
150 kW and up28

Charge points by power

≤ 11 kW3
12–22 kW18
23–49 kW0
50–149 kW8
≥ 150 kW30

Operators

EnBW mobility+ AG und Co.KG18
Stadtwerke Dorfen GmbH15
Fastned Deutschland GmbH & Co. KG8
EWE Go GmbH4
Überlandwerk Erding GmbH & Co. KG4
Lidl3
ALDI SÜD2
Richter+Frenzel GmbH + Co. KG2
Hotel & Apart4you GmbH2
Stefan Eder1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Reithel 4, 84405 Dorfen
    Fastned Deutschland GmbH & Co. KG400 kW8 pointsCCS24/7
    Directions
  • Zieglhaus 2, 84405 Dorfen
    EWE Go GmbH400 kW4 pointsCCS24/7
    Directions
  • Zieglhaus 1, 84405 Dorfen
    EnBW mobility+ AG und Co.KG300 kW14 pointsCCS, CHAdeMO, Type 2
    Directions
  • Haager Straße 60, 84405 Dorfen
    EnBW mobility+ AG und Co.KG150 kW4 pointsCCS
    Directions
  • Haager Str. 51, 84405 Dorfen
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Reithel 1, 84405 Dorfen
    Stadtwerke Dorfen GmbH50 kW3 pointsCCS, CHAdeMO, Type 2
    Directions
  • Haager Str. 61, 84405 Dorfen
    ALDI SÜD50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bahnhofstraße 0, 84405 Dorfen
    Stadtwerke Dorfen GmbH22 kW4 pointsType 2
    Directions
  • Ludwig-Mertl-Straße 1, 84405 Dorfen
    Stadtwerke Dorfen GmbH22 kW4 pointsType 2
    Directions
  • Haager Str. 31, 84405 Dorfen
    Stadtwerke Dorfen GmbH22 kW4 pointsType 2
    Directions
  • Josef-Martin-Bauer-Straße 18, 84405 Dorfen
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Haagerstr. 59, 84405 Dorfen
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Alte Ziegelei 2a, 84405 Dorfen
    Richter+Frenzel GmbH + Co. KG22 kW2 pointsType 2
    Directions
  • Marienplatz 10, 84405 Dorfen
    Hotel & Apart4you GmbH11 kW2 pointsType 224/7
    Directions
  • Korbinian-Aigner-Weg 1, 84405 Dorfen
    Stefan Eder11 kW1 pointsType 2
    Directions

Recently opened

  • 8 Apr 2026 · Haager Str. 61 · 50 kW · ALDI SÜD
  • 4 Dec 2025 · Reithel 4 · 400 kW · Fastned Deutschland GmbH & Co. KG
  • 6 Aug 2025 · Zieglhaus 2 · 400 kW · EWE Go GmbH
  • 10 Jun 2025 · Haager Str. 51 · 60 kW · Lidl
  • 15 Jul 2024 · Marienplatz 10 · 11 kW · Hotel & Apart4you GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET