Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Erding · Bayern · Germany

EV charging stations in Oberding

39 public charging sites with 94 charge points are registered in Oberding, including 2 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is Flughafen München GmbH with 82 charge points; 3 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites39
Charge points94
DC fast points2
150 kW and up2

Charge points by power

≤ 11 kW80
12–22 kW12
23–49 kW0
50–149 kW0
≥ 150 kW2

Operators

Flughafen München GmbH82
Lear Corporation Engineering GmbH8
Gemeinde Oberding4

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Allgemeine Luftfahrt 23, 85445 Oberding
    Flughafen München GmbH150 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Terminalstraße Mitte 14, 85445 Oberding
    Flughafen München GmbH3.7 kW65 pointsType 2
    Directions
  • Terminalstraße West 13, 85445 Oberding
    Flughafen München GmbH3.7 kW12 pointsType 2
    Directions
  • Lohstr. 36, 85445 Oberding
    Lear Corporation Engineering GmbH22 kW8 pointsType 2
    Directions
  • Hauptstr. 60, 85445 Oberding
    Gemeinde Oberding22 kW4 pointsType 2
    Directions
  • Terminalstraße Mitte 22, 85445 Oberding
    Flughafen München GmbH11 kW2 pointsType 2
    Directions
  • Terminalstraße Mitte 14, 85446 Oberding
    Flughafen München GmbH3.7 kW1 pointsType 2
    Directions

Recently opened

  • 16 May 2024 · Terminalstraße Mitte 14 · 3.7 kW · Flughafen München GmbH
  • 20 Feb 2024 · Lohstr. 36 · 22 kW · Lear Corporation Engineering GmbH
  • 25 Oct 2023 · Allgemeine Luftfahrt 23 · 150 kW · Flughafen München GmbH
  • 1 Jul 2023 · Terminalstraße Mitte 14 · 3.7 kW · Flughafen München GmbH
  • 4 Apr 2023 · Terminalstraße Mitte 22 · 11 kW · Flughafen München GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET