Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Erding · Bayern · Germany

EV charging stations in Erding

64 public charging sites with 125 charge points are registered in Erding, including 43 DC fast-charging points and 32 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Überlandwerk Erding GmbH & Co. KG with 48 charge points; 16 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites64
Charge points125
DC fast points43
150 kW and up32

Charge points by power

≤ 11 kW1
12–22 kW74
23–49 kW0
50–149 kW15
≥ 150 kW35

Operators

Überlandwerk Erding GmbH & Co. KG48
EnBW mobility+ AG und Co.KG21
Baugenossenschaft Erding eG14
Citywatt GmbH10
Energie Südbayern GmbH6
ALDI SÜD4
Parkhotel Erding GmbH4
Lidl3
Aral Pulse2
EWE Go GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Johann-Auer-Straße 2-4, 85435 Erding
    EnBW mobility+ AG und Co.KG300 kW12 pointsCCS24/7
    Directions
  • Johann-Auer-Straße 8, 85435 Erding
    Citywatt GmbH300 kW10 pointsCCS
    Directions
  • Ardeostr. 22, 85435 Erding
    EnBW mobility+ AG und Co.KG300 kW5 pointsCCS, Type 2
    Directions
  • Am Gries 21, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG150 kW4 pointsCCS, Type 2
    Directions
  • Sigwolfstraße 2, 85435 Erding
    Aral Pulse150 kW2 pointsCCS
    Directions
  • Otto-Hahn-Str. 35, 85435 Erding
    EWE Go GmbH150 kW2 pointsCCS24/7
    Directions
  • Anton-Huber-Str. 2, 85435 Erding
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Josef-Schwankl-Str. 1, 85435 Erding
    EnBW mobility+ AG und Co.KG50 kW4 pointsCCS, CHAdeMO
    Directions
  • Berghamer Str. 7, 85435 Erding
    ALDI SÜD50 kW2 pointsCCS24/7
    Directions
  • Pretzener Straße 10, 85435 Erding
    EDEKA50 kW2 pointsCCS, Type 2
    Directions
  • Am Kletthamer Feld 11, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG50 kW2 pointsCCS, CHAdeMO, Type 224/7
    Directions
  • Dachauer Str. 61, 85435 Erding
    Kaufland50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Thermenallee 2, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW26 pointsType 224/7
    Directions
  • Prielmayerstraße 7, 85435 Erding
    Baugenossenschaft Erding eG22 kW6 pointsType 2
    Directions
  • Am Bahnhof 3, 85435 Erding
    Parkhotel Erding GmbH22 kW4 pointsType 2
    Directions
  • Max-Planck-Str. 4, 85435 Erding
    Energie Südbayern GmbH22 kW4 pointsType 224/7
    Directions
  • Am Kletthamer Feld 1, 85435 Erding
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Alois-Schießl-Platz 2, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Dr.-Ulrich-Weg 4, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • An der Lukasmühle 5, 85435 Erding
    Energielösung GmbH22 kW2 pointsType 2
    Directions
  • An der Lukasmühle 7, 85435 Erding
    Sempt Nahenergie OHG22 kW2 pointsType 2
    Directions
  • Theodor-Ortner-Straße 8, 85435 Erding
    Baugenossenschaft Erding eG22 kW2 pointsType 2
    Directions
  • Bajuwarenstraße 9, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Robert-Bosch-Str. 9, 85435 Erding
    Auto Nagel GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Michael-Ferstl-Straße 19, 85435 Erding
    Baugenossenschaft Erding eG22 kW2 pointsType 2
    Directions
  • Taufkirchener Straße 24, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Herzogstandstr. 38, 85435 Erding
    Energie Südbayern GmbH22 kW2 pointsType 224/7
    Directions
  • Siglfinger Straße 50, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Sigwolfstraße 50, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Dachauerstr. 59, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Münchener Straße 134, 85435 Erding
    Überlandwerk Erding GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Beethovenstraße 24, 85435 Erding
    Baugenossenschaft Erding eG22 kW2 pointsType 2
    Directions
  • Beethovenstraße 24, 85425 Erding
    Baugenossenschaft Erding eG22 kW1 pointsType 2
    Directions
  • Theodor-Ortner-Straße 2, 85435 Erding
    Baugenossenschaft Erding eG22 kW1 pointsType 2
    Directions
  • Itzling 34a, 85435 Erding
    Matthias Fein11 kW1 pointsType 2
    Directions

Recently opened

  • 28 Nov 2025 · Johann-Auer-Straße 2-4 · 300 kW · EnBW mobility+ AG und Co.KG
  • 16 Mar 2025 · Herzogstandstr. 38 · 22 kW · Energie Südbayern GmbH
  • 2 Jan 2025 · Ardeostr. 22 · 300 kW · EnBW mobility+ AG und Co.KG
  • 18 Sept 2024 · Berghamer Str. 7 · 50 kW · ALDI SÜD
  • 13 Aug 2024 · Thermenallee 2 · 22 kW · Überlandwerk Erding GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET