EV charging stations in Eislingen /Fils
50 public charging sites with 69 charge points are registered in Eislingen /Fils, including 10 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 250 kW.
The largest operator is Salvia Gebäudetechnik GmbH with 28 charge points; 5 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Steinbeisstr. 6, 73054 Eislingen /FilsDirections
- Seewiesenstr. 12, 73054 Eislingen /FilsDirections
Other charging sites
AC charge points, sorted by number of points.
- Gutenbergstr. 1, 73054 Eislingen /FilsDirections
- Wilhelmstr. 72A, 73054 Eislingen /FilsDirections
- Kronenplatz 8, 73054 Eislingen /FilsDirections
- Scheerstr. 15, 73054 Eislingen /FilsDirections
- Holzheimer Str. 17, 73054 Eislingen /FilsDirections
- Ziegelbachstr. 24, 73054 Eislingen /FilsDirections
- Königstr. 60, 73054 Eislingen /FilsDirections
- Tälesweg 8, 73054 Eislingen /FilsDirections
- Kronenplatz 10, 73054 Eislingen /FilsDirections
- Industriestr. 11, 73054 Eislingen /FilsDirections
- Kirchstr. 13, 73054 Eislingen /FilsDirections
- Staufeneckstr. 32, 73054 Eislingen /FilsDirections
- Leonhardstr. 81, 73054 Eislingen /FilsDirections
Recently opened
- 6 Nov 2025 · Ziegelbachstr. 24 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 6 Nov 2025 · Königstr. 60 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 31 Oct 2025 · Holzheimer Str. 17 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 29 Oct 2025 · Kronenplatz 8 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 29 Oct 2025 · Scheerstr. 15 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Göppingen 277
- Geislingen an der Steige 74
- Uhingen 39
- Böhmenkirch 36
- Bad Boll 30
- Mühlhausen im Täle 26
- Süßen 25
Data: official national charge point register (1 September 2026). Data sources