Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Göppingen · Baden-Württemberg · Germany

EV charging stations in Süßen

13 public charging sites with 25 charge points are registered in Süßen, including 4 DC fast-charging points. The most powerful points deliver up to 60 kW.

The largest operator is Schwenger GmbH & Co. KG with 8 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites13
Charge points25
DC fast points4
150 kW and up0

Charge points by power

≤ 11 kW4
12–22 kW10
23–49 kW0
50–149 kW11
≥ 150 kW0

Operators

Schwenger GmbH & Co. KG8
EnBW mobility+ AG und Co.KG8
Lidl3
deer GmbH2
SCHARR Drive Ladestation2
Christian Reik1
Johanna Benner1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bühlstr. 17, 73079 Süßen
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Tobelstr. 2, 73079 Süßen
    Schwenger GmbH & Co. KG50 kW8 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bühlstr. 0, 73079 Süßen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Kultur- und Sporthalle 0, 73079 Süßen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Sommerauweg 11, 73079 Süßen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Bühlstraße 26, 73079 Süßen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Heidenheimer Str. 30, 73079 Süßen
    deer GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Hauptstr. 3, 73079 Süßen
    SCHARR Drive Ladestation11 kW2 pointsType 224/7
    Directions
  • Jörg-syrlin-str. 6, 73079 Süßen
    Christian Reik11 kW1 pointsType 2
    Directions
  • Stahlstraße 24, 73079 Süßen
    Johanna Benner1 kW1 pointsType 2
    Directions

Recently opened

  • 7 Aug 2025 · Hauptstr. 3 · 11 kW · SCHARR Drive Ladestation
  • 30 Sept 2024 · Tobelstr. 2 · 50 kW · Schwenger GmbH & Co. KG
  • 27 Jan 2023 · Bühlstr. 17 · 60 kW · Lidl
  • 21 Nov 2022 · Jörg-syrlin-str. 6 · 11 kW · Christian Reik
  • 21 Nov 2022 · Stahlstraße 24 · 1 kW · Johanna Benner

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET