EV charging stations in Geislingen an der Steige
37 public charging sites with 74 charge points are registered in Geislingen an der Steige, including 9 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 150 kW.
The largest operator is Albwerk Elektro- und Kommunikationstechnik GmbH with 28 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Eybstr. 98, 73312 Geislingen an der SteigeDirections
- Steingrubestr. 0, 73312 Geislingen an der SteigeDirections
- Bruckwiesen 0, 73312 Geislingen an der SteigeDirections
- Neuwiesenstr. 25, 73312 Geislingen an der SteigeDirections
- Stuttgarter Str. 272, 73312 Geislingen an der SteigeDirections
Other charging sites
AC charge points, sorted by number of points.
- Stuttgarter Str. 359, 73312 Geislingen an der SteigeDirections
- Schillerstrasse 4, 73312 Geislingen an der SteigeDirections
- Straubstraße 4-6, 73312 Geislingen an der SteigeDirections
- Ledergasse 19-21, 73312 Geislingen an der SteigeDirections
- Erzbergerstr. 0, 73312 Geislingen an der SteigeDirections
- Parkstr. 4, 73312 Geislingen an der SteigeDirections
- Schloßgasse 7, 73312 Geislingen an der SteigeDirections
- Stuttgarter Str. 99, 73312 Geislingen an der SteigeDirections
- Richthofenstr. 28, 73312 Geislingen an der SteigeDirections
- Böhmerwaldstraße 31, 73312 Geislingen an der SteigeDirections
- Bahnhofstr. 62, 73312 Geislingen an der SteigeDirections
- Wölkstr. 75, 73312 Geislingen an der SteigeDirections
Recently opened
- 24 Aug 2026 · Richthofenstr. 28 · 11 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 10 Jun 2026 · Böhmerwaldstraße 31 · 22 kW · Wirelane GmbH
- 19 Dec 2024 · Bruckwiesen 0 · 100 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 12 Dec 2024 · Erzbergerstr. 0 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
- 27 Nov 2024 · Parkstr. 4 · 22 kW · Albwerk Elektro- und Kommunikationstechnik GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Göppingen 277
- Eislingen /Fils 69
- Uhingen 39
- Böhmenkirch 36
- Bad Boll 30
- Mühlhausen im Täle 26
- Süßen 25
Data: official national charge point register (1 September 2026). Data sources