Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Konstanz · Baden-Württemberg · Germany

EV charging stations in Engen

24 public charging sites with 36 charge points are registered in Engen, including 28 DC fast-charging points and 26 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Tesla Germany GmbH with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites24
Charge points36
DC fast points28
150 kW and up26

Charge points by power

≤ 11 kW0
12–22 kW8
23–49 kW0
50–149 kW0
≥ 150 kW28

Operators

Tesla Germany GmbH12
mblty GmbH10
Shell Deutschland GmbH4
Stadtwerke Engen GmbH4
EWE Go GmbH2
naturenergie2
Autohaus Rolf Moser GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hegau West 0, 78234 Engen
    mblty GmbH300 kW4 pointsCCS
    Directions
  • Hegaustr. 13, 78234 Engen
    Shell Deutschland GmbH300 kW4 pointsCCS
    Directions
  • Raststätte Hegau-West 0, 78234 Engen
    mblty GmbH300 kW2 pointsCCS
    Directions
  • Jahnstr. 45, 78234 Engen
    EWE Go GmbH300 kW2 pointsCCS24/7
    Directions
  • Jahnstr. 48, 78234 Engen
    Tesla Germany GmbH250 kW12 pointsCCS24/7
    Directions
  • Raststätte Hegau West 0, 78234 Engen
    mblty GmbH150 kW4 pointsCCS, Type 2
    Directions
  • Jahnstraße 41, 78234 Engen
    Autohaus Rolf Moser GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Am Maxenbuck 0, 78234 Engen
    Stadtwerke Engen GmbH22 kW2 pointsType 2
    Directions
  • Ballenbergstr. 5, 78234 Engen
    naturenergie22 kW2 pointsType 224/7
    Directions
  • Hegaustraße 5a, 78234 Engen
    Stadtwerke Engen GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 13 Jul 2026 · Hegaustr. 13 · 300 kW · Shell Deutschland GmbH
  • 25 Jun 2026 · Ballenbergstr. 5 · 22 kW · naturenergie
  • 17 Jun 2025 · Jahnstr. 48 · 250 kW · Tesla Germany GmbH
  • 18 Mar 2024 · Jahnstr. 45 · 300 kW · EWE Go GmbH
  • 19 Jan 2021 · Jahnstraße 41 · 22 kW · Autohaus Rolf Moser GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET