Day-ahead today07:40€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Konstanz · Baden-Württemberg · Germany

EV charging stations in Radolfzell am Bodensee

22 public charging sites with 44 charge points are registered in Radolfzell am Bodensee, including 24 DC fast-charging points and 24 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Regioladen+ with 14 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites22
Charge points44
DC fast points24
150 kW and up24

Charge points by power

≤ 11 kW5
12–22 kW14
23–49 kW0
50–149 kW0
≥ 150 kW25

Operators

Regioladen+14
eliso12
Aral Pulse6
EWE Go GmbH4
ALDI SÜD3
Fahrdienst Radolfzell2
TotalEnergies Charging Solutions2
Georg Wagenhan1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Reute 0, 78315 Radolfzell am Bodensee
    eliso400 kW12 pointsCCS24/7
    Directions
  • Robert-Gerwig-Str. 27, 78315 Radolfzell am Bodensee
    EWE Go GmbH400 kW4 pointsCCS24/7
    Directions
  • Eisenbahnstr. 8, 78315 Radolfzell am Bodensee
    Aral Pulse300 kW6 pointsCCS
    Directions
  • Eisenbahnstr. 1, 78315 Radolfzell am Bodensee
    ALDI SÜD150 kW3 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Güttinger Str. 11, 78315 Radolfzell am Bodensee
    Regioladen+22 kW4 pointsType 224/7
    Directions
  • Markthallenstr. 1, 78315 Radolfzell am Bodensee
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Nezfeld 1, 78315 Radolfzell am Bodensee
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Zeppelinstr. 20, 78315 Radolfzell am Bodensee
    Regioladen+22 kW2 pointsType 2
    Directions
  • Otto-Blesch-Str. 32, 78315 Radolfzell am Bodensee
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Lindenallee 44, 78315 Radolfzell am Bodensee
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Ekkehardstraße 37, 78315 Radolfzell am Bodensee
    Fahrdienst Radolfzell11 kW2 pointsType 224/7
    Directions
  • Böhringer Str. 50, 78315 Radolfzell am Bodensee
    TotalEnergies Charging Solutions11 kW2 pointsType 2
    Directions
  • Paul-Gerhardt-Straße 5, 78315 Radolfzell am Bodensee
    Georg Wagenhan11 kW1 pointsType 2
    Directions

Recently opened

  • 27 Oct 2025 · Reute 0 · 400 kW · eliso
  • 24 Nov 2024 · Böhringer Str. 50 · 11 kW · TotalEnergies Charging Solutions
  • 17 Oct 2024 · Robert-Gerwig-Str. 27 · 400 kW · EWE Go GmbH
  • 27 Sept 2024 · Eisenbahnstr. 1 · 150 kW · ALDI SÜD
  • 17 Jul 2024 · Nezfeld 1 · 22 kW · Regioladen+

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET