Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Landkreis Konstanz · Baden-Württemberg · Germany

EV charging stations in Stockach

26 public charging sites with 54 charge points are registered in Stockach, including 17 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Regioladen+ with 22 charge points; 11 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points54
DC fast points17
150 kW and up16

Charge points by power

≤ 11 kW3
12–22 kW35
23–49 kW0
50–149 kW0
≥ 150 kW16

Operators

Regioladen+22
MER Germany8
EnBW mobility+ AG und Co.KG8
Baugenossenschaft Stockach e.G.3
Shell Deutschland GmbH2
AVIA Volt2
ALDI SÜD2
Autohaus Konrad Martin GmbH & Co KG2
LAN1 Hotspots GmbH2
AS Oxidwerke GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Ludwigshafener Str. 2, 78333 Stockach
    MER Germany400 kW8 pointsCCS24/7
    Directions
  • Messkirchner Str. 37, 78333 Stockach
    Shell Deutschland GmbH300 kW2 pointsCCS
    Directions
  • Dillstraße 2, 78333 Stockach
    EnBW mobility+ AG und Co.KG200 kW4 pointsCCS24/7
    Directions
  • Tuttlinger Str. 41, 78333 Stockach
    AVIA Volt150 kW2 pointsCCS
    Directions
  • Ludwigshafener Str. 2, 78333 Stockach
    Autohaus Konrad Martin GmbH & Co KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Gewerbestraße 8, 78333 Stockach
    EnBW mobility+ AG und Co.KG22 kW4 pointsType 2
    Directions
  • Heinrich-Fahr-Str. 1, 78333 Stockach
    Regioladen+22 kW4 pointsType 224/7
    Directions
  • Dillstr. 24, 78333 Stockach
    Regioladen+22 kW4 pointsType 224/7
    Directions
  • Mozartstr. 8, 78333 Stockach
    Baugenossenschaft Stockach e.G.22 kW3 pointsType 224/7
    Directions
  • Orsinger Str. 1, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Schloßplatz 1, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Meßkircher Straße 2, 78333 Stockach
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Adenauerstr. 4, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Riedstr. 7, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Hägerweg 16, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Am Stadtgarten 16, 78333 Stockach
    Regioladen+22 kW2 pointsType 2
    Directions
  • Goethestr. 24, 78333 Stockach
    Regioladen+22 kW2 pointsType 224/7
    Directions
  • Stahringer Str. 50, 78333 Stockach
    LAN1 Hotspots GmbH22 kW2 pointsType 2
    Directions
  • Nenzinger Str. 17, 78333 Stockach
    AS Oxidwerke GmbH11 kW2 pointsType 2
    Directions
  • Am Maisenbühl 8, 78333 Stockach
    Kay Diederichs8 kW1 pointsType 2
    Directions

Recently opened

  • 16 Sept 2025 · Dillstraße 2 · 200 kW · EnBW mobility+ AG und Co.KG
  • 23 Apr 2025 · Ludwigshafener Str. 2 · 400 kW · MER Germany
  • 30 Dec 2024 · Mozartstr. 8 · 22 kW · Baugenossenschaft Stockach e.G.
  • 5 Oct 2023 · Adenauerstr. 4 · 22 kW · Regioladen+
  • 7 Jul 2023 · Messkirchner Str. 37 · 300 kW · Shell Deutschland GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out