EV charging stations in Furth
9 public charging sites with 26 charge points are registered in Furth, including 4 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is SoLaR GmbH with 20 charge points; 3 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Lippacher Str. 1, 84095 FurthDirections
Other charging sites
AC charge points, sorted by number of points.
- Am Rathaus 7, 84095 FurthDirections
- Am Klosterberg 1, 84095 FurthDirections
- Landshuter Straße 3, 84095 FurthDirections
Recently opened
- 27 Jan 2025 · Lippacher Str. 1 · 300 kW · Shell Deutschland GmbH
- 11 May 2021 · Landshuter Straße 3 · 22 kW · MER Germany
- 24 Aug 2020 · Am Rathaus 7 · 22 kW · SoLaR GmbH
- 1 May 2020 · Am Klosterberg 1 · 22 kW · SoLaR GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Vilsbiburg 87
- Ergolding 51
- Essenbach 40
- Landshut 213
- Mainburg 41
- Ismaning 71
- Schierling 38
- Abensberg 42
- Münchsmünster 44
- Freising 128
- Neustadt a.d.Donau 53
- Oberding 94
Data: official national charge point register (1 September 2026). Data sources