Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Böblingen · Baden-Württemberg · Germany

EV charging stations in Gärtringen

18 public charging sites with 33 charge points are registered in Gärtringen, including 6 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is deer GmbH with 14 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points33
DC fast points6
150 kW and up6

Charge points by power

≤ 11 kW0
12–22 kW27
23–49 kW0
50–149 kW0
≥ 150 kW6

Operators

deer GmbH14
EnBW mobility+ AG und Co.KG6
Circle K Deutschland4
Wirelane GmbH4
Bürgerenergie Nordschwarzwald-Gäu e.G.3
ALDI SÜD2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Böblinger Str. 6, 71116 Gärtringen
    Circle K Deutschland300 kW4 pointsCCS, CHAdeMO24/7
    Directions
  • Max-Planck-Str. 36, 71116 Gärtringen
    ALDI SÜD150 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hauptstr. 16, 71116 Gärtringen
    Bürgerenergie Nordschwarzwald-Gäu e.G.22 kW3 pointsType 2
    Directions
  • Rohrweg 2, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 2
    Directions
  • Nufringer Straße 2, 71116 Gärtringen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Nufringer Str. 2, 71116 Gärtringen
    EnBW mobility+ AG und Co.KG22 kW2 pointsType 2
    Directions
  • Vorstadt 4, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 224/7
    Directions
  • Bismarckstraße 4, 71116 Gärtringen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Nufringer Str. 8, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 2
    Directions
  • Hauptstraße 9, 71116 Gärtringen
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Robert-Bosch-Str. 15, 71116 Gärtringen
    deer GmbH22 kW2 pointsdomestic socket, Type 2
    Directions
  • Vorstadt 15, 71116 Gärtringen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Stuttgarter Str. 17, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 2
    Directions
  • Schickhardtstr. 32, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 224/7
    Directions
  • Grabenstr. 60, 71116 Gärtringen
    deer GmbH22 kW2 pointsType 224/7
    Directions

Recently opened

  • 1 Feb 2026 · Hauptstr. 16 · 22 kW · Bürgerenergie Nordschwarzwald-Gäu e.G.
  • 15 Oct 2025 · Max-Planck-Str. 36 · 150 kW · ALDI SÜD
  • 16 May 2025 · Bismarckstraße 4 · 22 kW · Wirelane GmbH
  • 16 May 2025 · Vorstadt 15 · 22 kW · Wirelane GmbH
  • 9 Dec 2024 · Böblinger Str. 6 · 300 kW · Circle K Deutschland

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET