EV charging stations in Weil der Stadt
23 public charging sites with 46 charge points are registered in Weil der Stadt, including 12 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is deer GmbH with 20 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Grabenstr. 2, 71263 Weil der StadtDirections
- Merklinger Str. 14, 71263 Weil der StadtDirections
- Hauptstr. 55, 71263 Weil der StadtDirections
- Siemensstr. 1, 71263 Weil der StadtDirections
Other charging sites
AC charge points, sorted by number of points.
- Hermann-Schnaufer-Str. 7, 71263 Weil der StadtDirections
- Kirchplatz 2, 71263 Weil der StadtDirections
- Neuffenstr. 4, 71263 Weil der StadtDirections
- Dorfstr. 10, 71263 Weil der StadtDirections
- Hermann-Schnaufer-Straße 12, 71263 Weil der StadtDirections
- Brückengasse 13, 71263 Weil der StadtDirections
- Paul-Reusch-Str. 19, 71263 Weil der StadtDirections
- Eisenbahnstraße 20, 71263 Weil der StadtDirections
- Hinter Höfen 20, 71263 Weil der StadtDirections
- Max-Caspar-Str. 47, 71263 Weil der StadtDirections
- Untere Talstr. 66, 71263 Weil der StadtDirections
- Blammerbergstr. 115, 71263 Weil der StadtDirections
- Paul-Reusch-Str. 8, 71263 Weil der StadtDirections
- Fronäcker 3, 71263 Weil der StadtDirections
Recently opened
- 12 Feb 2026 · Neuffenstr. 4 · 22 kW · deer GmbH
- 13 Jan 2026 · Grabenstr. 2 · 300 kW · JET Tankstellen Deutschland GmbH
- 18 Dec 2025 · Siemensstr. 1 · 60 kW · Lidl
- 7 Oct 2025 · Hauptstr. 55 · 100 kW · EnBW mobility+ AG und Co.KG
- 12 Jun 2025 · Merklinger Str. 14 · 150 kW · Autohaus Weeber Weil der Stadt
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Sindelfingen 1,001
- Böblingen 287
- Leonberg 169
- Renningen 122
- Herrenberg 76
- Holzgerlingen 37
- Ehningen 34
- Gärtringen 33
- Rutesheim 29
Data: official national charge point register (1 September 2026). Data sources