EV charging stations in Herrenberg
47 public charging sites with 76 charge points are registered in Herrenberg, including 30 DC fast-charging points and 26 delivering at least 150 kW. The most powerful points deliver up to 360 kW.
The largest operator is IONITY GmbH with 12 charge points; 19 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Ohmstraße 5, 71083 HerrenbergDirections
- Hewlett-Packard-Str. 2, 71083 HerrenbergDirections
- Ohmstr. 5/1, 71083 HerrenbergDirections
- Ohmstr. 1, 71083 HerrenbergDirections
- Daimlerstr. 16, 71083 HerrenbergDirections
- Otto-Hahn-Straße 26, 71083 HerrenbergDirections
Other charging sites
AC charge points, sorted by number of points.
- Stadthallenstraße 3, 71083 HerrenbergDirections
- Gültsteiner Str. 88, 71083 HerrenbergDirections
- Ohmstr. 3, 71083 HerrenbergDirections
- Adlerstraße 6, 71083 HerrenbergDirections
- Hindenburgstr. 14-18, 71083 HerrenbergDirections
- Hasenplatz 6, 71083 HerrenbergDirections
- Am Fichtenberg 1, 71083 HerrenbergDirections
- Steinhauptstr. 9, 71083 HerrenbergDirections
- Benzstr. 10, 71083 HerrenbergDirections
- Berliner Str. 13, 71083 HerrenbergDirections
- Oberjesinger Str. 43, 71083 HerrenbergDirections
- Kalkofenstraße 50, 71083 HerrenbergDirections
- Leinenbrunnen 4/1, 71083 HerrenbergDirections
- Sulmstr. 17, 71083 HerrenbergDirections
- Marie-Curie-Straße 4, 71083 HerrenbergDirections
- Habichtstraße 3, 71083 HerrenbergDirections
- Glemsweg 7, 71083 HerrenbergDirections
- Gänsbergring 45303, 71083 HerrenbergDirections
Recently opened
- 12 Aug 2026 · Oberjesinger Str. 43 · 22 kW · deer GmbH
- 3 Aug 2026 · Steinhauptstr. 9 · 22 kW · deer GmbH
- 17 Jul 2026 · Berliner Str. 13 · 22 kW · deer GmbH
- 3 Jul 2026 · Leinenbrunnen 4/1 · 22 kW · deer GmbH
- 27 Jun 2026 · Hewlett-Packard-Str. 2 · 350 kW · IONITY GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Sindelfingen 1,001
- Böblingen 287
- Leonberg 169
- Renningen 122
- Weil der Stadt 46
- Holzgerlingen 37
- Ehningen 34
- Gärtringen 33
- Rutesheim 29
Data: official national charge point register (1 September 2026). Data sources