Day-ahead today07:40€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Westerwaldkreis · Rheinland-Pfalz · Germany

EV charging stations in Höhr-Grenzhausen

13 public charging sites with 31 charge points are registered in Höhr-Grenzhausen, including 14 DC fast-charging points and 12 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Energieversorgung Mittelrhein AG with 20 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites13
Charge points31
DC fast points14
150 kW and up12

Charge points by power

≤ 11 kW7
12–22 kW10
23–49 kW0
50–149 kW2
≥ 150 kW12

Operators

Energieversorgung Mittelrhein AG20
EnBW mobility+ AG und Co.KG6
Aral Pulse2
Löhr Automobile GmbH2
Bernd Simon1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Rastplatz Grenzau 0, 56203 Höhr-Grenzhausen
    EnBW mobility+ AG und Co.KG300 kW2 pointsCCS, CHAdeMO
    Directions
  • Westerwaldstrasse 12-14, 56203 Höhr-Grenzhausen
    EnBW mobility+ AG und Co.KG300 kW2 pointsCCS, CHAdeMO
    Directions
  • Schillerstr. 19, 56203 Höhr-Grenzhausen
    Energieversorgung Mittelrhein AG150 kW6 pointsCCS24/7
    Directions
  • Am Autobahnzubringer/ West 0, 56203 Höhr-Grenzhausen
    Aral Pulse150 kW2 pointsCCS
    Directions
  • Autobahnraststätte Grenzau Süd 0, 56203 Höhr-Grenzhausen
    EnBW mobility+ AG und Co.KG50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Auf der Haide 28, 56203 Höhr-Grenzhausen
    Löhr Automobile GmbH22 kW2 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Schillerstraße 19, 56203 Höhr-Grenzhausen
    Energieversorgung Mittelrhein AG22 kW8 pointsType 2
    Directions
  • Brexbachstraße 11, 56203 Höhr-Grenzhausen
    Energieversorgung Mittelrhein AG11 kW6 pointsType 2
    Directions
  • Schweitzerstr. 26, 56203 Höhr-Grenzhausen
    Bernd Simon11 kW1 pointsType 2
    Directions

Recently opened

  • 28 Jan 2025 · Schweitzerstr. 26 · 11 kW · Bernd Simon
  • 8 Nov 2023 · Schillerstr. 19 · 150 kW · Energieversorgung Mittelrhein AG
  • 24 Jul 2023 · Am Autobahnzubringer/ West 0 · 150 kW · Aral Pulse
  • 21 Apr 2023 · Schillerstraße 19 · 22 kW · Energieversorgung Mittelrhein AG
  • 6 Feb 2023 · Brexbachstraße 11 · 11 kW · Energieversorgung Mittelrhein AG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET