EV charging stations in Husum
64 public charging sites with 109 charge points are registered in Husum, including 32 DC fast-charging points and 24 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Stadtwerke Husum GmbH with 57 charge points; 17 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Flensburger Chaussee 44, 25813 HusumDirections
- Robert-Koch-Straße 28, 25813 HusumDirections
- Robert-Koch-Str. 15, 25813 HusumDirections
- Bredstedter Straße 41, 25813 HusumDirections
- Bredstedter Str. 2, 25813 HusumDirections
- Robert-Koch-Str. 32, 25813 HusumDirections
- Flensburger Chaussee 40, 25813 HusumDirections
- Am Binnenhafen 1, 25813 HusumDirections
- Nordseestr. 14, 25813 HusumDirections
- Deichstraße 20, 25813 HusumDirections
- Robert-Koch-Str. 40, 25813 HusumDirections
- Andreas-Clausen-Straße 1, 25813 HusumDirections
Other charging sites
AC charge points, sorted by number of points.
- Am Binnenhafen 5, 25813 HusumDirections
- Großstraße 15-17, 25813 HusumDirections
- Großstr. 15-17, 25813 HusumDirections
- Am Messeplatz 12-18, 25813 HusumDirections
- Marktstr. 6, 25813 HusumDirections
- Siemensstr. 30, 25813 HusumDirections
- Robert-Koch-Str. 8-10, 25813 HusumDirections
- Goethestraße 46-48, 25813 HusumDirections
- Neustadt 60-68, 25813 HusumDirections
- Marktstraße 6, 25813 HusumDirections
- Robert-Koch-Straße 11, 25813 HusumDirections
- Hinter der Neustadt 74, 25813 HusumDirections
- Siemensstraße 1, 25813 HusumDirections
- Lornsenstraße 41, 25813 HusumDirections
- Lornsenstr. 41, 25813 HusumDirections
- Siemensstr. 45, 25813 HusumDirections
- Süderstr. 97, 25813 HusumDirections
- Hamm 4, 25813 HusumDirections
- Hamm 19, 25813 HusumDirections
- Memeler Straße 30, 25813 HusumDirections
Recently opened
- 1 Apr 2026 · Am Binnenhafen 1 · 149 kW · Stadtwerke Husum GmbH
- 8 Jul 2025 · Flensburger Chaussee 44 · 400 kW · Aral Pulse
- 10 Dec 2024 · Nordseestr. 14 · 50 kW · Stadtwerke Husum GmbH
- 1 Aug 2024 · Robert-Koch-Str. 15 · 300 kW · EnBW mobility+ AG und Co.KG
- 22 Apr 2024 · Großstr. 15-17 · 22 kW · Stadtwerke Husum GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
Data: official national charge point register (1 September 2026). Data sources