Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Nordfriesland · Schleswig-Holstein · Germany

EV charging stations in Sylt

33 public charging sites with 56 charge points are registered in Sylt, including 22 DC fast-charging points and 20 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is TUI Blue DE GmbH with 16 charge points; 13 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites33
Charge points56
DC fast points22
150 kW and up20

Charge points by power

≤ 11 kW9
12–22 kW11
23–49 kW0
50–149 kW2
≥ 150 kW34

Operators

TUI Blue DE GmbH16
GP JOULE Connect GmbH10
AlbatrosServiceGesellschaft mbH4
Shell Deutschland GmbH4
Comfort Charge4
Verwaltungsgesellschaft Alte Strandvogtei mbH4
Wirelane GmbH4
CutPower Charging Hub2
EA-DD2
Allego2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bahnweg 4, 25980 Sylt
    AlbatrosServiceGesellschaft mbH300 kW4 pointsCCS
    Directions
  • Trift 7, 25980 Sylt
    Shell Deutschland GmbH300 kW4 pointsCCS24/7
    Directions
  • Stephanstr. 14, 25980 Sylt
    Comfort Charge200 kW4 pointsCCS24/7
    Directions
  • Hafenstr. 1a, 25980 Sylt
    TUI Blue DE GmbH150 kW16 pointsCCS, Type 224/7
    Directions
  • Kiarwai 1, 25980 Sylt
    CutPower Charging Hub150 kW2 pointsCCS, CHAdeMO
    Directions
  • Trift 1, 25980 Sylt
    EA-DD150 kW2 pointsCCS24/7
    Directions
  • Industrieweg 13, 25980 Sylt
    Allego150 kW2 pointsCCS
    Directions
  • Kiarwai 18-24, 25980 Sylt
    Lidl50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Merret-Lassen-Wai 6, 25980 Sylt
    Verwaltungsgesellschaft Alte Strandvogtei mbH22 kW4 pointsType 224/7
    Directions
  • Melnstich 7, 25980 Sylt
    GP JOULE Connect GmbH22 kW4 pointsType 2
    Directions
  • Schützenstraße 20, 25980 Sylt
    Wirelane GmbH11 kW4 pointsType 2
    Directions
  • Lornsenstr. 2a, 25980 Sylt
    GP JOULE Connect GmbH11 kW3 pointsType 2
    Directions
  • Zum Fliegerhorst 3-9, 25980 Sylt
    GP JOULE Connect GmbH22 kW2 pointsType 2
    Directions
  • Industrieweg 17, 25980 Sylt
    Autohaus Georg Nielsen GmbH22 kW1 pointsType 224/7
    Directions
  • Fischerweg 35, 25980 Sylt
    Objekt Wattenscheid Ottostrasse 2-4 Gbr11 kW1 pointsType 2
    Directions
  • Lornsenstraße 2a, 25980 Sylt
    GP JOULE Connect GmbH11 kW1 pointsType 2
    Directions

Recently opened

  • 26 Jun 2026 · Trift 7 · 300 kW · Shell Deutschland GmbH
  • 26 Feb 2026 · Kiarwai 18-24 · 50 kW · Lidl
  • 27 Oct 2025 · Industrieweg 17 · 22 kW · Autohaus Georg Nielsen GmbH
  • 30 Apr 2025 · Lornsenstr. 2a · 11 kW · GP JOULE Connect GmbH
  • 30 Apr 2025 · Lornsenstraße 2a · 11 kW · GP JOULE Connect GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET