EV charging stations in Sankt Peter-Ording
27 public charging sites with 43 charge points are registered in Sankt Peter-Ording, including 10 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is GP JOULE Connect GmbH with 10 charge points; 11 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Bövergeest 69A, 25826 Sankt Peter-OrdingDirections
- Dreilanden 7b, 25826 Sankt Peter-OrdingDirections
- Nordergeest 5, 25826 Sankt Peter-OrdingDirections
Other charging sites
AC charge points, sorted by number of points.
- Am Kurbad 2, 25826 Sankt Peter-OrdingDirections
- Fritz-Wischer-Straße 13, 25826 Sankt Peter-OrdingDirections
- Utholmer Str. -, 25826 Sankt Peter-OrdingDirections
- Im Bad 63, 25826 Sankt Peter-OrdingDirections
- Wittendüner Geest 1, 25826 Sankt Peter-OrdingDirections
- Fritz-Wischer-Str. 1, 25826 Sankt Peter-OrdingDirections
- Kölfhamm 6, 25826 Sankt Peter-OrdingDirections
- Im Bad 59, 25826 Sankt Peter-OrdingDirections
- Zum Böhler Strand -, 25826 Sankt Peter-OrdingDirections
- Theodor-Storm-Weg 9a, 25826 Sankt Peter-OrdingDirections
- Ostlandstr. 9, 25826 Sankt Peter-OrdingDirections
Recently opened
- 12 Jun 2026 · Fritz-Wischer-Straße 13 · 11 kW · Wirelane GmbH
- 28 Jan 2026 · Nordergeest 5 · 60 kW · Lidl
- 4 Dec 2025 · Dreilanden 7b · 400 kW · LichtBlick eMobility GmbH
- 20 Jun 2025 · Bövergeest 69A · 400 kW · ORLEN Deutschland GmbH
- 6 Feb 2023 · Ostlandstr. 9 · 11 kW · Jürgen Theo Reinhard Rüth
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Husum 109
- Sylt 56
- Reußenköge 44
- Niebüll 38
- St. Peter-Ording 27
- Sylt OT Westerland 26
Data: official national charge point register (1 September 2026). Data sources