Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Kleve · Nordrhein-Westfalen · Germany

EV charging stations in Kalkar

23 public charging sites with 43 charge points are registered in Kalkar, including 5 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 200 kW.

The largest operator is Landhaus Beckmann GmbH & Co. KG with 8 charge points; 10 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites23
Charge points43
DC fast points5
150 kW and up4

Charge points by power

≤ 11 kW4
12–22 kW35
23–49 kW0
50–149 kW0
≥ 150 kW4

Operators

Landhaus Beckmann GmbH & Co. KG8
Wirelane GmbH8
Westenergie Metering GmbH8
Stadtwerke Kalkar GmbH & Co. KG6
EnBW mobility+ AG und Co.KG4
Kuster Charging4
Autohaus Evers & Seitz GmbH2
wilfried winkelnmann1
Rüdiger Finkhaus1
Norbert Niehoff1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bahnhofstr. 26, 47546 Kalkar
    EnBW mobility+ AG und Co.KG200 kW4 pointsCCS
    Directions
  • Oyweg 18, 47546 Kalkar
    Autohaus Evers & Seitz GmbH22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Römerstrasse 1, 47546 Kalkar
    Landhaus Beckmann GmbH & Co. KG22 kW6 pointsType 2
    Directions
  • Im Schwanenhorst 1, 47546 Kalkar
    Stadtwerke Kalkar GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Römerstrasse Kalkar 1
    Landhaus Beckmann GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Gasthausstege ggü. 3, 47546 Kalkar
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • industriepark 4 4, 47546 Kalkar
    Kuster Charging22 kW2 pointsType 2
    Directions
  • Schuldamm 12, 47546 Kalkar
    Stadtwerke Kalkar GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Birkenallee ggü. 15, 47546 Kalkar
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Dorfstraße 21, 47546 Kalkar
    Stadtwerke Kalkar GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Tiller Str. ggü. 31, 47546 Kalkar
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Uhlandstraße 47, 47546 Kalkar
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Grabenstraße 78, 47546 Kalkar
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Heinrich-Eger-Str. 10z, 47546 Kalkar
    Westenergie Metering GmbH22 kW2 pointsType 224/7
    Directions
  • Kirchhofstr. 16z, 47546 Kalkar
    Westenergie Metering GmbH22 kW2 pointsType 224/7
    Directions
  • Jan-Joest-Str. 36z, 47546 Kalkar
    Westenergie Metering GmbH22 kW2 pointsType 224/7
    Directions
  • Griether Str. 110 - 120, 47546 Kalkar
    Kuster Charging11 kW2 pointsType 2
    Directions
  • Rotes Häuschen 15, 47546 Kalkar
    wilfried winkelnmann22 kW1 pointsType 2
    Directions
  • Birkenallee 10, 47546 Kalkar
    Rüdiger Finkhaus11 kW1 pointsType 2
    Directions
  • Heinrich-Eger-Straße 12, 47546 Kalkar
    Norbert Niehoff11 kW1 pointsType 2
    Directions

Recently opened

  • 13 Oct 2025 · Uhlandstraße 47 · 22 kW · Wirelane GmbH
  • 10 Jun 2025 · Bahnhofstr. 26 · 200 kW · EnBW mobility+ AG und Co.KG
  • 30 Jan 2025 · Gasthausstege ggü. 3 · 22 kW · Wirelane GmbH
  • 29 Jan 2025 · Birkenallee ggü. 15 · 22 kW · Wirelane GmbH
  • 24 Jan 2025 · Tiller Str. ggü. 31 · 22 kW · Wirelane GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET