EV charging stations in Kevelaer
40 public charging sites with 83 charge points are registered in Kevelaer, including 13 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is Stadtwerke Kevelaer with 30 charge points; 9 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Walbecker Straße 7, 47623 KevelaerDirections
- Lindenstr. 64, 47623 KevelaerDirections
- Antwerpener Platz 1, 47623 KevelaerDirections
- Kevelaerer Straße 53ADirections
- Feldstraße 68, 47623 KevelaerDirections
Other charging sites
AC charge points, sorted by number of points.
- Am Scheidweg 1, 47624 KevelaerDirections
- Tünnstraße 9, 47624 KevelaerDirections
- Hüls 19, 47623 KevelaerDirections
- Basilikastr. 7, 47623 KevelaerDirections
- Peter-Plümpe-Platz 12, 47623 KevelaerDirections
- Hüls 21, 47623 KevelaerDirections
- Kardinal-von-Galen-Straße 27, 47623 KevelaerDirections
- Ladestraße 46, 47623 KevelaerDirections
- Weezer Straße 61, 47623 KevelaerDirections
- Hoogeweg 100, 47623 KevelaerDirections
- Kroatenstr. 125, 47623 KevelaerDirections
- Sonnenstraße 48B, 47623 KevelaerDirections
- Nordstraße 62a, 47623 KevelaerDirections
- Dorfstraße 47, 47624 KevelaerDirections
- Hauptstraße 20, 47625 KevelaerDirections
- Neuer Markt 10, 47626 KevelaerDirections
- Sonsbecker Str. 10, 47626 KevelaerDirections
- Marktplatz 1, 47627 KevelaerDirections
Recently opened
- 20 Aug 2025 · Lindenstr. 64 · 300 kW · Shell Deutschland GmbH
- 31 Jul 2024 · Antwerpener Platz 1 · 50 kW · Frischecenter Brüggemeier GmbH, Kevelaer-Zentrum
- 1 Jul 2024 · Am Scheidweg 1 · 11 kW · Irrland GmbH & Co. KG
- 23 May 2024 · Tünnstraße 9 · 22 kW · Janßen Sunergy GmbH
- 14 May 2024 · Hüls 19 · 11 kW · Wirelane GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Goch 143
- Geldern 85
- Kleve 70
- Rees 52
- Kalkar 43
- Emmerich am Rhein 41
- Rheurdt 40
- Straelen 30
- Kranenburg 29
- Weeze 28
Data: official national charge point register (1 September 2026). Data sources