Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Kleve · Nordrhein-Westfalen · Germany

EV charging stations in Kranenburg

15 public charging sites with 29 charge points are registered in Kranenburg, including 6 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Goch Energie GmbH with 16 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites15
Charge points29
DC fast points6
150 kW and up4

Charge points by power

≤ 11 kW0
12–22 kW23
23–49 kW0
50–149 kW2
≥ 150 kW4

Operators

Stadtwerke Goch Energie GmbH16
Aral Pulse4
Hermann-Josef van Bergen3
EnBW mobility+ AG und Co.KG2
ALDI SÜD2
Energiegenossenschaft Kranenburg e.G.2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Klever Straße 85, 47559 Kranenburg
    Aral Pulse300 kW4 pointsCCS
    Directions
  • Am Storchennest 3, 47559 Kranenburg
    EnBW mobility+ AG und Co.KG75 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Großen Haag 6-10, 47559 Kranenburg
    Stadtwerke Goch Energie GmbH22 kW8 pointsType 2
    Directions
  • Antoniusweg 1, 47559 Kranenburg
    Stadtwerke Goch Energie GmbH22 kW4 pointsType 2
    Directions
  • Bruchweg 38, 47559 Kranenburg
    Stadtwerke Goch Energie GmbH22 kW4 pointsType 2
    Directions
  • Gocher Straße 57, 47559 Kranenburg
    Hermann-Josef van Bergen22 kW3 pointsType 2
    Directions
  • Großen Haag 7, 47559 Kranenburg
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Großen Haag 7, 47559 Kranenburg
    Energiegenossenschaft Kranenburg e.G.22 kW2 pointsType 2
    Directions

Recently opened

  • 9 Jun 2026 · Am Storchennest 3 · 75 kW · EnBW mobility+ AG und Co.KG
  • 17 Jan 2024 · Klever Straße 85 · 300 kW · Aral Pulse
  • 1 Mar 2023 · Großen Haag 6-10 · 22 kW · Stadtwerke Goch Energie GmbH
  • 10 Feb 2023 · Antoniusweg 1 · 22 kW · Stadtwerke Goch Energie GmbH
  • 10 Feb 2023 · Bruchweg 38 · 22 kW · Stadtwerke Goch Energie GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET