Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ortenaukreis · Baden-Württemberg · Germany

EV charging stations in Kappel-Grafenhausen

26 public charging sites with 46 charge points are registered in Kappel-Grafenhausen, including 22 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Shell Deutschland GmbH with 12 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points46
DC fast points22
150 kW and up22

Charge points by power

≤ 11 kW0
12–22 kW24
23–49 kW0
50–149 kW0
≥ 150 kW22

Operators

Shell Deutschland GmbH12
Tesla Germany GmbH10
Citywatt GmbH8
naturenergie8
Hotel Restaurant Engel4
EnBW mobility+ AG und Co.KG2
Gemeinde Kappel-Grafenhausen2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hauptstr. 201, 77966 Kappel-Grafenhausen
    Shell Deutschland GmbH300 kW12 pointsCCS
    Directions
  • Hauptstrasse 201, 77966 Kappel-Grafenhausen
    Tesla Germany GmbH250 kW10 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Fertighauswelt 1, 77966 Kappel-Grafenhausen
    Citywatt GmbH22 kW8 pointsType 2
    Directions
  • Am Mühlenrain 1, 77966 Kappel-Grafenhausen
    naturenergie22 kW8 pointsType 224/7
    Directions
  • Hauptstrasse 92, 77966 Kappel-Grafenhausen
    Hotel Restaurant Engel22 kW4 pointsType 2
    Directions
  • Löwenstr. 1, 77966 Kappel-Grafenhausen
    EnBW mobility+ AG und Co.KG22 kW2 pointsType 2
    Directions
  • Löwenstraße 1, 77966 Kappel-Grafenhausen
    Gemeinde Kappel-Grafenhausen22 kW2 pointsType 2
    Directions

Recently opened

  • 6 May 2025 · Am Mühlenrain 1 · 22 kW · naturenergie
  • 26 Mar 2025 · Hauptstr. 201 · 300 kW · Shell Deutschland GmbH
  • 20 Mar 2023 · Hauptstrasse 201 · 250 kW · Tesla Germany GmbH
  • 22 Apr 2022 · Fertighauswelt 1 · 22 kW · Citywatt GmbH
  • 8 Feb 2022 · Hauptstrasse 92 · 22 kW · Hotel Restaurant Engel

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET