Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Ortenaukreis · Baden-Württemberg · Germany

EV charging stations in Rust

80 public charging sites with 150 charge points are registered in Rust, including 6 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is badenova AG & Co. KG with 137 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites80
Charge points150
DC fast points6
150 kW and up6

Charge points by power

≤ 11 kW0
12–22 kW140
23–49 kW0
50–149 kW0
≥ 150 kW10

Operators

badenova AG & Co. KG137
Hotel Andante OHG4
naturenergie4
EnBW mobility+ AG und Co.KG4
Konrad Rein1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Roland-Mack-Ring 3, 77977 Rust
    badenova AG & Co. KG150 kW6 pointsCCS, Type 224/7
    Directions
  • Peter-Thumb-Str. 6, 77977 Rust
    badenova AG & Co. KG150 kW2 pointsCCS24/7
    Directions
  • Europa-Park-Str. 4+6, 77977 Rust
    badenova AG & Co. KG150 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Rheinweg 5, 77977 Rust
    badenova AG & Co. KG22 kW85 pointsType 224/7
    Directions
  • Roland-Mack-Ring 1, 77977 Rust
    badenova AG & Co. KG22 kW20 pointsType 224/7
    Directions
  • Europa-Park-Straße 4-6, 77977 Rust
    badenova AG & Co. KG22 kW18 pointsType 2
    Directions
  • Peter-Thumb-Str. 2, 77977 Rust
    Hotel Andante OHG22 kW4 pointsType 2
    Directions
  • Peter-Thumb-Straße 6, 77977 Rust
    badenova AG & Co. KG22 kW4 pointsType 2
    Directions
  • Karl-Friedrich-Str. 7, 77977 Rust
    naturenergie22 kW4 pointsType 224/7
    Directions
  • Erich-Spoth-Str. 2, 77977 Rust
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Fischerstr. 51, 77977 Rust
    EnBW mobility+ AG und Co.KG22 kW2 pointsdomestic socket, Type 2
    Directions
  • Grafenhausener Straße 12, 77977 Rust
    Konrad Rein22 kW1 pointsType 2
    Directions

Recently opened

  • 24 Mar 2026 · Karl-Friedrich-Str. 7 · 22 kW · naturenergie
  • 21 May 2025 · Rheinweg 5 · 22 kW · badenova AG & Co. KG
  • 26 Mar 2025 · Roland-Mack-Ring 1 · 22 kW · badenova AG & Co. KG
  • 12 Apr 2024 · Roland-Mack-Ring 3 · 150 kW · badenova AG & Co. KG
  • 12 Apr 2024 · Peter-Thumb-Str. 6 · 150 kW · badenova AG & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET