Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Landsberg am Lech · Bayern · Germany

EV charging stations in Kaufering

40 public charging sites with 68 charge points are registered in Kaufering, including 20 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is E.ON Drive GmbH with 36 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites40
Charge points68
DC fast points20
150 kW and up16

Charge points by power

≤ 11 kW1
12–22 kW44
23–49 kW0
50–149 kW7
≥ 150 kW16

Operators

E.ON Drive GmbH36
Tesla Germany GmbH12
HELMER GMBH5
Shell Deutschland GmbH4
LEW Natur GmbH4
Lidl3
ALDI SÜD2
energie schwaben gmbh2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Viktor-Frankl-Str. 1, 86916 Kaufering
    Shell Deutschland GmbH300 kW4 pointsCCS
    Directions
  • Viktor-Frankl-Straße 3A, 86916 Kaufering
    Tesla Germany GmbH250 kW12 pointsCCS
    Directions
  • Kolpingstr. 10, 86916 Kaufering
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Viktor-Frankl-Str. 7, 86916 Kaufering
    LEW Natur GmbH50 kW4 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Hiltistr. 2, 86916 Kaufering
    E.ON Drive GmbH22 kW36 pointsType 2
    Directions
  • Viktor Frank.Str. 22, 86916 Kaufering
    HELMER GMBH22 kW4 pointsType 2
    Directions
  • Viktor-Frankl-Straße 2, 86916 Kaufering
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Landrat-Müller-Hahl-Straße 15, 86916 Kaufering
    energie schwaben gmbh22 kW2 pointsType 2
    Directions
  • Kolpingstr. 42, 86916 Kaufering
    HELMER GMBH11 kW1 pointsType 224/7
    Directions

Recently opened

  • 31 Jul 2025 · Viktor-Frankl-Str. 1 · 300 kW · Shell Deutschland GmbH
  • 29 Apr 2025 · Kolpingstr. 10 · 60 kW · Lidl
  • 1 Jul 2024 · Kolpingstr. 42 · 11 kW · HELMER GMBH
  • 3 Apr 2024 · Viktor-Frankl-Str. 7 · 50 kW · LEW Natur GmbH
  • 16 Jun 2023 · Viktor-Frankl-Straße 3A · 250 kW · Tesla Germany GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET