Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Hersfeld-Rotenburg · Hessen · Germany

EV charging stations in Niederaula

14 public charging sites with 26 charge points are registered in Niederaula, including 23 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Tank & Rast Entwicklungsgesellschaft mbH with 14 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites14
Charge points26
DC fast points23
150 kW and up22

Charge points by power

≤ 11 kW2
12–22 kW0
23–49 kW0
50–149 kW2
≥ 150 kW22

Operators

Tank & Rast Entwicklungsgesellschaft mbH14
EWE Go GmbH4
EAM Natur Energie GmbH4
Lidl2
Marktgemeinde Niederaula2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Jossastr. 65, 36272 Niederaula
    EWE Go GmbH400 kW4 pointsCCS24/7
    Directions
  • Jossastr. 65, 36272 Niederaula
    Tank & Rast Entwicklungsgesellschaft mbH340 kW14 pointsCCS24/7
    Directions
  • Schlitzer Str. 5a, 36272 Niederaula
    EAM Natur Energie GmbH300 kW4 pointsCCS24/7
    Directions
  • Hersfelder Str. 20, 36272 Niederaula
    Lidl50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Schlitzer Straße 3, 36272 Niederaula
    Marktgemeinde Niederaula11 kW2 pointsType 2
    Directions

Recently opened

  • 13 Apr 2026 · Jossastr. 65 · 340 kW · Tank & Rast Entwicklungsgesellschaft mbH
  • 13 May 2025 · Jossastr. 65 · 400 kW · EWE Go GmbH
  • 29 Oct 2024 · Schlitzer Str. 5a · 300 kW · EAM Natur Energie GmbH
  • 10 Mar 2022 · Hersfelder Str. 20 · 50 kW · Lidl
  • 9 Sept 2019 · Schlitzer Straße 3 · 11 kW · Marktgemeinde Niederaula

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET