Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis München · Bayern · Germany

EV charging stations in Ottobrunn

25 public charging sites with 44 charge points are registered in Ottobrunn, including 6 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 170 kW.

The largest operator is EDEKA with 10 charge points; 9 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites25
Charge points44
DC fast points6
150 kW and up2

Charge points by power

≤ 11 kW2
12–22 kW28
23–49 kW0
50–149 kW6
≥ 150 kW8

Operators

EDEKA10
Simon Gruber GmbH & Co. KG8
E.ON Drive GmbH8
MAHAG Automobilhandel und Service GmbH & Co. oHG4
Energielösung GmbH4
eze.network GmbH4
Lidl2
Wirelane GmbH2
Andreas Fehrenbach2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Rosenheimer Landstr. 50, 85521 Ottobrunn
    Simon Gruber GmbH & Co. KG170 kW8 pointsCCS, Type 224/7
    Directions
  • Siemensstr. 2, 85521 Ottobrunn
    Lidl140 kW2 pointsCCS24/7
    Directions
  • Rosenheimer Landstraße 112, 85521 Ottobrunn
    MAHAG Automobilhandel und Service GmbH & Co. oHG50 kW4 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Unterhachinger Str. 28, 85521 Ottobrunn
    EDEKA22 kW10 pointsType 224/7
    Directions
  • Finsinger Feld 1, 85521 Ottobrunn
    E.ON Drive GmbH22 kW8 pointsType 2
    Directions
  • Maria-Merian-Str. 6, 85521 Ottobrunn
    Energielösung GmbH22 kW4 pointsType 224/7
    Directions
  • Haidgraben 121, 85521 Ottobrunn
    eze.network GmbH22 kW4 pointsType 224/7
    Directions
  • Dahlienstraße 30, 85521 Ottobrunn
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Haydnstraße 4, 85521 Ottobrunn
    Andreas Fehrenbach11 kW2 pointsType 2
    Directions

Recently opened

  • 17 Dec 2025 · Rosenheimer Landstr. 50 · 170 kW · Simon Gruber GmbH & Co. KG
  • 19 Nov 2025 · Unterhachinger Str. 28 · 22 kW · EDEKA
  • 10 Nov 2025 · Dahlienstraße 30 · 22 kW · Wirelane GmbH
  • 8 Oct 2025 · Siemensstr. 2 · 140 kW · Lidl
  • 16 May 2025 · Maria-Merian-Str. 6 · 22 kW · Energielösung GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET