Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Tübingen · Baden-Württemberg · Germany

EV charging stations in Rottenburg am Neckar

22 public charging sites with 44 charge points are registered in Rottenburg am Neckar, including 11 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Rottenburg am Neckar GmbH with 13 charge points; 11 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites22
Charge points44
DC fast points11
150 kW and up6

Charge points by power

≤ 11 kW8
12–22 kW21
23–49 kW0
50–149 kW5
≥ 150 kW10

Operators

Stadtwerke Rottenburg am Neckar GmbH13
EnBW mobility+ AG und Co.KG10
Team-Emobility GmbH5
Lidl3
Kaufland2
deer GmbH2
Edel GmbH & Co.KG2
Auto Grammer e.K.2
ALDI SÜD2
Elektrizitätswerk Karl Stengle GmbH & Co. KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Hirschauer Straße 34, 72108 Rottenburg am Neckar
    EnBW mobility+ AG und Co.KG300 kW5 pointsCCS, Type 2
    Directions
  • Schuhstraße 77, 72108 Rottenburg am Neckar
    EnBW mobility+ AG und Co.KG150 kW5 pointsCCS, Type 2
    Directions
  • Graf-Bentzel-Str. 22, 72108 Rottenburg am Neckar
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Tübinger Str. 2, 72108 Rottenburg am Neckar
    Kaufland50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Bellinostraße 6, 72108 Rottenburg am Neckar
    Edel GmbH & Co.KG22 kW2 pointsCCS, Type 2
    Directions
  • Gosbertstraße 24, 72108 Rottenburg am Neckar
    Auto Grammer e.K.22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Schuhstrasse 77, 72108 Rottenburg am Neckar
    Team-Emobility GmbH11 kW5 pointsType 2
    Directions
  • Rosengartenstr. 2, 72108 Rottenburg am Neckar
    deer GmbH22 kW2 pointsType 224/7
    Directions
  • Nobelstraße 7, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW2 pointsType 2
    Directions
  • Jahnstraße 9, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW2 pointsType 2
    Directions
  • Siebenlindenstr. 19, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW2 pointsType 2
    Directions
  • Rottenburger Str. 26, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW2 pointsType 2
    Directions
  • Seebronner Straße 50, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW2 pointsType 2
    Directions
  • Gartenstr. 85, 72108 Rottenburg am Neckar
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Bachstr. 105, 72108 Rottenburg am Neckar
    Elektrizitätswerk Karl Stengle GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Sprollstr. 6, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH22 kW1 pointsType 2
    Directions
  • Vordere Gasse 3, 72108 Rottenburg am Neckar
    Britta Pohlmann11 kW1 pointsType 2
    Directions
  • Obere Gasse 12, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH11 kW1 pointsType 2
    Directions
  • Schütte 12, 72108 Rottenburg am Neckar
    Stadtwerke Rottenburg am Neckar GmbH11 kW1 pointsType 2
    Directions

Recently opened

  • 7 Aug 2026 · Rottenburger Str. 26 · 22 kW · Stadtwerke Rottenburg am Neckar GmbH
  • 23 Dec 2025 · Bachstr. 105 · 22 kW · Elektrizitätswerk Karl Stengle GmbH & Co. KG
  • 22 May 2025 · Schuhstrasse 77 · 11 kW · Team-Emobility GmbH
  • 30 Aug 2024 · Rosengartenstr. 2 · 22 kW · deer GmbH
  • 27 Oct 2023 · Graf-Bentzel-Str. 22 · 60 kW · Lidl

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET