Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Starnberg · Bayern · Germany

EV charging stations in Starnberg

29 public charging sites with 57 charge points are registered in Starnberg, including 17 DC fast-charging points and 16 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is 17er Oberlandenergie with 12 charge points; 15 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites29
Charge points57
DC fast points17
150 kW and up16

Charge points by power

≤ 11 kW2
12–22 kW39
23–49 kW0
50–149 kW0
≥ 150 kW16

Operators

17er Oberlandenergie12
EWE Go GmbH8
Energie Südbayern GmbH8
Jolt Energy GmbH6
Bayerischer Yacht-Club e.V.4
Energieversorgung Landsberg GmbH & Co. KG4
eliso2
E.ON Drive GmbH2
Ortner2
Energielösung GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Münchner Str. 16-18, 82319 Starnberg
    Jolt Energy GmbH400 kW4 pointsCCS24/7
    Directions
  • Riedener Weg 2, 82319 Starnberg
    eliso320 kW2 pointsCCS24/7
    Directions
  • Münchner Str. 10, 82319 Starnberg
    EWE Go GmbH200 kW8 pointsCCS24/7
    Directions
  • Münchner Str. 14, 82319 Starnberg
    Jolt Energy GmbH160 kW2 pointsCCS
    Directions
  • Gautinger Straße 5, 82319 Starnberg
    Ortner22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Uneringer Str. 1, 82319 Starnberg
    Energie Südbayern GmbH22 kW8 pointsType 224/7
    Directions
  • Nepomukweg 0, 82319 Starnberg
    17er Oberlandenergie22 kW4 pointsType 224/7
    Directions
  • Nepomueg 10-12, 82319 Starnberg
    Bayerischer Yacht-Club e.V.22 kW4 pointsType 2
    Directions
  • Hans-Zellner-Weg 0, 82319 Starnberg
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Wildmoosstr. 0, 82319 Starnberg
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Vogelanger 2, 82319 Starnberg
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Maximilianstr. 2, 82319 Starnberg
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Vogelanger 2, 82319 Starnberg
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Würmstr. 5, 82319 Starnberg
    Energielösung GmbH22 kW2 pointsType 224/7
    Directions
  • Himbselstraße 7, 82319 Starnberg
    Energieversorgung Landsberg GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Leutstettener Str. 26, 82319 Starnberg
    Autohaus Michael Schmidt GmbH22 kW2 pointsType 2
    Directions
  • Gautingerstrasse 1D, 82319 Starnberg
    Energieversorgung Landsberg GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Gautinger Str. 39, 82319 Starnberg
    mediantis AG11 kW2 pointsType 2
    Directions
  • Moosstraße 16, 82319 Starnberg
    Hellmut Krüger Heizung - Sanitär GmbH & Co. KG22 kW1 pointsType 2
    Directions
  • Maurerberg 4a, 82319 Starnberg
    Robert Roither22 kW1 pointsType 2
    Directions
  • Maximilianstraße 2, 82319 Starnberg
    Christian Reitter18 kW1 pointsType 2
    Directions

Recently opened

  • 21 May 2026 · Münchner Str. 16-18 · 400 kW · Jolt Energy GmbH
  • 29 Apr 2026 · Münchner Str. 10 · 200 kW · EWE Go GmbH
  • 19 Feb 2026 · Wildmoosstr. 0 · 22 kW · 17er Oberlandenergie
  • 4 Aug 2025 · Würmstr. 5 · 22 kW · Energielösung GmbH
  • 4 Jul 2025 · Vogelanger 2 · 22 kW · 17er Oberlandenergie

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET