Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis München · Bayern · Germany

EV charging stations in Oberhaching

18 public charging sites with 38 charge points are registered in Oberhaching, including 4 DC fast-charging points and 4 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Gemeindewerke Oberhaching GmbH with 24 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites18
Charge points38
DC fast points4
150 kW and up4

Charge points by power

≤ 11 kW0
12–22 kW34
23–49 kW0
50–149 kW0
≥ 150 kW4

Operators

Gemeindewerke Oberhaching GmbH24
Ilzhöfer Inh. Walch GmbH & Co. KG4
Energie Südbayern GmbH4
Citywatt GmbH2
Autohaus Hengge GmbH2
Erdwärme Grünwald2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Raiffeisenallee 7, 82041 Oberhaching
    Ilzhöfer Inh. Walch GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Im Loh 1, 82041 Oberhaching
    Energie Südbayern GmbH22 kW4 pointsType 224/7
    Directions
  • Pfarrer-Socher-Straße 37, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW4 pointsType 2
    Directions
  • Sauerlacher Straße 0, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Hubertusplatz 0, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Pfarrweg 0, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Parkplatz Kybergstraße 2, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Sommerfeld 2, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Ludwig-Thoma-Straße 2, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Ödenpullach 3, 82041 Oberhaching
    Citywatt GmbH22 kW2 pointsType 2
    Directions
  • Raiffeisenallee 4, 82041 Oberhaching
    Autohaus Hengge GmbH22 kW2 pointsType 2
    Directions
  • Alpenstraße 11, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Laufzorner Straße 104, 82041 Oberhaching
    Erdwärme Grünwald22 kW2 pointsType 2
    Directions
  • Pfarrer-Hobmair-Weg bei 1, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Bajuwarenring bei 21, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions
  • Abt-Petto-Straße bei 35, 82041 Oberhaching
    Gemeindewerke Oberhaching GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 1 Aug 2024 · Raiffeisenallee 7 · 400 kW · Ilzhöfer Inh. Walch GmbH & Co. KG
  • 27 Oct 2023 · Bajuwarenring bei 21 · 22 kW · Gemeindewerke Oberhaching GmbH
  • 16 Jun 2023 · Ludwig-Thoma-Straße 2 · 22 kW · Gemeindewerke Oberhaching GmbH
  • 6 Jun 2023 · Pfarrer-Socher-Straße 37 · 22 kW · Gemeindewerke Oberhaching GmbH
  • 6 Jun 2023 · Abt-Petto-Straße bei 35 · 22 kW · Gemeindewerke Oberhaching GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET