Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Bad Tölz-Wolfratshausen · Bayern · Germany

EV charging stations in Geretsried

25 public charging sites with 36 charge points are registered in Geretsried, including 4 DC fast-charging points. The most powerful points deliver up to 60 kW.

The largest operator is 17er Oberlandenergie with 21 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites25
Charge points36
DC fast points4
150 kW and up0

Charge points by power

≤ 11 kW2
12–22 kW27
23–49 kW4
50–149 kW3
≥ 150 kW0

Operators

17er Oberlandenergie21
EREA4
Kaufland3
EnBW mobility+ AG und Co.KG2
ALDI SÜD2
E.ON Drive GmbH2
Thomas Vielreicher1
Schöfmann Steuerungselektronik GmbH1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Bayerwaldstr. 2, 82538 Geretsried
    Kaufland60 kW3 pointsCCS, Type 2
    Directions
  • Egerlandstr. 57, 82538 Geretsried
    17er Oberlandenergie49.9 kW4 pointsCCS, Type 224/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Adalbert-Stifter-Str. 20, 82538 Geretsried
    17er Oberlandenergie22 kW5 pointsType 2
    Directions
  • Karl-Lederer-Platz 18, 82538 Geretsried
    EREA22 kW4 pointsType 2
    Directions
  • Am Neuen Platz 1, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 2
    Directions
  • Karl-Lederer-Platz 1, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 2
    Directions
  • Richard-Wagner-Str. 9, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Elbstraße 21, 82538 Geretsried
    EnBW mobility+ AG und Co.KG22 kW2 pointsType 2
    Directions
  • Sudetenstr. 33, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 2
    Directions
  • Egerlandstr. 54, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Sudetenstraße 68, 82538 Geretsried
    ALDI SÜD22 kW2 pointsType 2
    Directions
  • Sudentenstraße 29-43, 82538 Geretsried
    E.ON Drive GmbH22 kW2 pointsType 2
    Directions
  • Banater Str. 14a, 82538 Geretsried
    17er Oberlandenergie22 kW2 pointsType 224/7
    Directions
  • Wolfratshauser Straße 8, 82538 Geretsried
    Thomas Vielreicher11 kW1 pointsType 2
    Directions
  • Breslauer Weg 31, 82538 Geretsried
    Schöfmann Steuerungselektronik GmbH11 kW1 pointsType 2
    Directions

Recently opened

  • 2 Apr 2026 · Richard-Wagner-Str. 9 · 22 kW · 17er Oberlandenergie
  • 21 Nov 2025 · Banater Str. 14a · 22 kW · 17er Oberlandenergie
  • 29 Mar 2025 · Egerlandstr. 54 · 22 kW · 17er Oberlandenergie
  • 27 Mar 2025 · Egerlandstr. 57 · 49.9 kW · 17er Oberlandenergie
  • 29 Oct 2024 · Bayerwaldstr. 2 · 60 kW · Kaufland

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET