Day-ahead today18:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.9▼ −11.4%
MethodologyAbout & contact
Kreis Pinneberg · Schleswig-Holstein · Germany

EV charging stations in Uetersen

16 public charging sites with 32 charge points are registered in Uetersen, including 10 DC fast-charging points and 2 delivering at least 150 kW. The most powerful points deliver up to 180 kW.

The largest operator is Stadtwerke Uetersen GmbH with 10 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points32
DC fast points10
150 kW and up2

Charge points by power

≤ 11 kW0
12–22 kW22
23–49 kW0
50–149 kW8
≥ 150 kW2

Operators

Stadtwerke Uetersen GmbH10
E.ON Drive GmbH8
Wirelane GmbH8
Vattenfall Smarter Living GmbH2
Sonektro GmbH2
HanseWerk Charging Station2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Tornescher Weg 81, 25436 Uetersen
    Vattenfall Smarter Living GmbH180 kW2 pointsCCS
    Directions
  • Gerberstr. 3,5, 25436 Uetersen
    Stadtwerke Uetersen GmbH50 kW4 pointsCCS24/7
    Directions
  • Berliner Str. 17, 25436 Uetersen
    Stadtwerke Uetersen GmbH50 kW2 pointsCCS24/7
    Directions
  • Wassermühlenstr. bei 7, 25436 Uetersen
    Sonektro GmbH50 kW2 pointsCCS24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Lohe 2, 25436 Uetersen
    E.ON Drive GmbH22 kW8 pointsType 2
    Directions
  • Am Markt 8, 25436 Uetersen
    Stadtwerke Uetersen GmbH22 kW2 pointsType 2
    Directions
  • Rudolf-Kinau-Weg 10, 25436 Uetersen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Theodor-Storm-Allee 14, 25436 Uetersen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Ahornweg 15, 25436 Uetersen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • J.-P.-Lange-Straße 18, 25436 Uetersen
    Wirelane GmbH22 kW2 pointsType 2
    Directions
  • Reuterstraße 42, 25436 Uetersen
    HanseWerk Charging Station22 kW2 pointsType 2
    Directions
  • Marktstraße 17-19, 25436 Uetersen
    Stadtwerke Uetersen GmbH22 kW2 pointsType 2
    Directions

Recently opened

  • 15 Dec 2025 · Wassermühlenstr. bei 7 · 50 kW · Sonektro GmbH
  • 23 Sept 2025 · J.-P.-Lange-Straße 18 · 22 kW · Wirelane GmbH
  • 11 Sept 2025 · Berliner Str. 17 · 50 kW · Stadtwerke Uetersen GmbH
  • 9 Sept 2025 · Rudolf-Kinau-Weg 10 · 22 kW · Wirelane GmbH
  • 9 Sept 2025 · Theodor-Storm-Allee 14 · 22 kW · Wirelane GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices are out