EV charging stations in Wittmund
30 public charging sites with 59 charge points are registered in Wittmund, including 15 DC fast-charging points and 6 delivering at least 150 kW. The most powerful points deliver up to 150 kW.
The largest operator is Energiegenossenschaft für Wittmund eG with 43 charge points; 6 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Eggelinger Straße 18, 26409 WittmundDirections
- Bahnhofstr. 44, 26409 WittmundDirections
- Am Harlesiel 0, 26409 WittmundDirections
- Karl-Bösch-Platz 2, 26409 WittmundDirections
- Kutterweg 2, 26409 WittmundDirections
- Osterstr. 9, 26409 WittmundDirections
- Isums 48, 26409 WittmundDirections
- Mühlenstr. 75, 26409 WittmundDirections
- Am Markt 16, 26409 WittmundDirections
- Barghamm 17, 26409 WittmundDirections
- Robert-Koch-Straße 2, 26409 WittmundDirections
Other charging sites
AC charge points, sorted by number of points.
- Nordseestraße 1, 26409 WittmundDirections
- Friedrichsschleuse 1, 26409 WittmundDirections
- Bahnhofsstraße 40, 26409 WittmundDirections
- Kurt-Schwitters-Platz 0, 26409 WittmundDirections
- Am Markt 9, 26409 WittmundDirections
- Dohuser Weg 10-14, 26409 WittmundDirections
- Breslauer Str. 19-21, 26409 WittmundDirections
- Burhafer Str. 18, 26409 WittmundDirections
- Utarper Weg 24, 26409 WittmundDirections
Recently opened
- 23 Apr 2025 · Mühlenstr. 75 · 50 kW · Energiegenossenschaft für Wittmund eG
- 4 Apr 2025 · Isums 48 · 50 kW · Energiegenossenschaft für Wittmund eG
- 25 Mar 2025 · Am Harlesiel 0 · 50 kW · Energiegenossenschaft für Wittmund eG
- 24 Mar 2025 · Kutterweg 2 · 50 kW · Energiegenossenschaft für Wittmund eG
- 13 Mar 2025 · Osterstr. 9 · 50 kW · Energiegenossenschaft für Wittmund eG
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Esens 36
- Jever 42
- Schortens 34
- Aurich 91
- Wilhelmshaven 114
- Varel 110
- Butjadingen 83
- Uplengen 29
- Norden 76
- Westerstede 70
- Norderney 49
- Leer 43
Data: official national charge point register (1 September 2026). Data sources