Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Leer · Niedersachsen · Germany

EV charging stations in Uplengen

15 public charging sites with 29 charge points are registered in Uplengen, including 24 DC fast-charging points and 22 delivering at least 150 kW. The most powerful points deliver up to 400 kW.

The largest operator is Aral Pulse with 10 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites15
Charge points29
DC fast points24
150 kW and up22

Charge points by power

≤ 11 kW1
12–22 kW4
23–49 kW0
50–149 kW2
≥ 150 kW22

Operators

Aral Pulse10
EWE Go GmbH8
EWE Go HOCHTIEF Ladepartner GmbH & Co. KG4
Vattenfall Smarter Living GmbH4
AZA Pollmann & Reuter OHG2
Guido Berends1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Rudolf-Diesel-Str. 2, 26670 Uplengen
    EWE Go GmbH400 kW4 pointsCCS24/7
    Directions
  • Alter Postweg 83, 26670 Uplengen
    EWE Go HOCHTIEF Ladepartner GmbH & Co. KG400 kW4 pointsCCS24/7
    Directions
  • Rudolf-Diesel-Straße 2, 26670 Uplengen
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Rudolf-Diesel-Str. 4, 26670 Uplengen
    Aral Pulse300 kW4 pointsCCS
    Directions
  • Rudolf-Diesel-Straße 4, 26670 Uplengen
    Aral Pulse300 kW2 pointsCCS
    Directions
  • Ostertorstr. 62, 26670 Uplengen
    Vattenfall Smarter Living GmbH180 kW4 pointsCCS24/7
    Directions
  • Rudolf-Diesel-Straße 1, 26670 Uplengen
    EWE Go GmbH50 kW2 pointsCCS, CHAdeMO, Type 2
    Directions
  • Ostertorstraße 89, 26670 Uplengen
    AZA Pollmann & Reuter OHG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Alter Postweg 113, 26670 Uplengen
    EWE Go GmbH22 kW2 pointsType 224/7
    Directions
  • Ostertorstraße 29, 26670 Uplengen
    Guido Berends11 kW1 pointsType 2
    Directions

Recently opened

  • 13 Aug 2025 · Alter Postweg 83 · 400 kW · EWE Go HOCHTIEF Ladepartner GmbH & Co. KG
  • 14 Jan 2025 · Ostertorstr. 62 · 180 kW · Vattenfall Smarter Living GmbH
  • 19 Dec 2024 · Rudolf-Diesel-Str. 2 · 400 kW · EWE Go GmbH
  • 28 May 2024 · Rudolf-Diesel-Str. 4 · 300 kW · Aral Pulse
  • 23 Feb 2023 · Ostertorstraße 29 · 11 kW · Guido Berends

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET