EV charging stations in Aurich
50 public charging sites with 91 charge points are registered in Aurich, including 47 DC fast-charging points and 35 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is EWE Go GmbH with 42 charge points; 15 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Am Pferdemarkt 5, 26603 AurichDirections
- Esenser Str. 109-111, 26607 AurichDirections
- Emder Str. 19, 26603 AurichDirections
- Popenser Str. 2, 26603 AurichDirections
- Dreekamp 2, 26605 AurichDirections
- Westerlooger Straße 1, 26607 AurichDirections
- Raiffeisenstr. 18, 26603 AurichDirections
- Südeweg 7, 26607 AurichDirections
- Fischteichweg 13, 26603 AurichDirections
- Emder Str. 21, 26603 AurichDirections
- Marktplatz 11-15, 26603 AurichDirections
- Esensser Str. 299, 26607 AurichDirections
- Raiffeisenstr. 12, 26603 AurichDirections
- Fischteichweg 0, 26603 AurichDirections
- Tjüchkampstr. 4A, 26605 AurichDirections
- Arentestraße 2, 26607 AurichDirections
Other charging sites
AC charge points, sorted by number of points.
- Esenser Straße 299, 26607 AurichDirections
- Wallinghausener Str. 10-13, 26603 AurichDirections
- Westerlooger Straße 12, 26607 AurichDirections
- Marktplatz 11, 26603 AurichDirections
- Leerer Landstr. 36, 26603 AurichDirections
- Tjüchkamp 4a, 26603 AurichDirections
- Korbweidenstr. 5, 26605 AurichDirections
- Tjüchkampstraße 4A, 26605 AurichDirections
- Zu den Norderstücken 2, 26607 AurichDirections
- Liebigstr. 9, 26607 AurichDirections
- Esenser Str. 140, 26607 AurichDirections
- Am Pferdemarkt 5, 26603 AurichDirections
- Ol Streek 70, 26607 AurichDirections
- Greenkerweg 6, 26605 AurichDirections
- Zum Schirumer Leegmoor 7, 26605 AurichDirections
Recently opened
- 30 Jun 2026 · Esenser Str. 109-111 · 300 kW · Aral Pulse
- 11 Jun 2026 · Raiffeisenstr. 12 · 60 kW · Lidl
- 18 Nov 2025 · Popenser Str. 2 · 180 kW · Vattenfall Smarter Living GmbH
- 21 Oct 2025 · Am Pferdemarkt 5 · 300 kW · EWE Go GmbH
- 23 Jul 2025 · Raiffeisenstr. 18 · 150 kW · EDEKA-MIHA Charge GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Data: official national charge point register (1 September 2026). Data sources