EV charging stations in Ahlen
33 public charging sites with 69 charge points are registered in Ahlen, including 25 DC fast-charging points and 9 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Stadtwerke Ahlen GmbH with 25 charge points; 16 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Dolberger Str. 145, 59229 AhlenDirections
- Am Vatheuershof 13, 59229 AhlenDirections
- Industriestraße 29, 59229 AhlenDirections
- Beckumer Str. 105, 59229 AhlenDirections
- Beckumer Str. 109, 59229 AhlenDirections
- Kruppstr. 2b, 59227 AhlenDirections
- Gebrüder-Kerkmann-Platz 4, 59229 AhlenDirections
- Kleiwellenfeld 16, 59229 AhlenDirections
- Ostbredenstr. 95, 59229 AhlenDirections
Other charging sites
AC charge points, sorted by number of points.
- Schinkelstrasse 80, 59227 AhlenDirections
- Zeche Westfalen 1, 59229 AhlenDirections
- Am Vatheuershof 3, 59229 AhlenDirections
- Alter Hof 4, 59227 AhlenDirections
- Westenmauer 10, 59227 AhlenDirections
- Hauptstraße 16, 59227 AhlenDirections
- Warendorfer Str. 26, 59227 AhlenDirections
- Hammer Str. 99, 59227 AhlenDirections
- Kruppstr. 2 b, 59227 AhlenDirections
- Alleestr. 1, 59229 AhlenDirections
- Industriestraße 40, 59229 AhlenDirections
- Grottkauer Straße 8, 59227 AhlenDirections
- Borbeiner Str. 10, 59227 AhlenDirections
- Hermesweg 3, 59229 AhlenDirections
- Asternweg 15, 59229 AhlenDirections
Recently opened
- 22 Apr 2026 · Dolberger Str. 145 · 400 kW · AVIA Volt
- 27 Aug 2025 · Am Vatheuershof 13 · 200 kW · Senger NEO GmbH
- 7 Jan 2025 · Ostbredenstr. 95 · 50 kW · ALDI Nord
- 9 Oct 2024 · Warendorfer Str. 26 · 22 kW · Art Hotel Ahlen
- 2 May 2024 · Asternweg 15 · 11 kW · Reload-Solution GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Beckum 130
- Warendorf 82
- Sendenhorst 51
- Oelde 48
- Everswinkel 42
- Drensteinfurt 35
- Ennigerloh 33
- Telgte 31
- Beelen 29
- Sassenberg 25
Data: official national charge point register (1 September 2026). Data sources