EV charging stations in Oelde
30 public charging sites with 48 charge points are registered in Oelde, including 12 DC fast-charging points and 10 delivering at least 150 kW. The most powerful points deliver up to 350 kW.
The largest operator is Stadtwerke Ostmünsterland GmbH & Co. KG with 13 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- In der Geist 120, 59302 OeldeDirections
- Warendorfer Str. 73-75, 59302 OeldeDirections
- Carl-Haver-Platz 3, 59302 OeldeDirections
- In der Geist 110, 59302 OeldeDirections
- Westriceg 2, 59302 OeldeDirections
Other charging sites
AC charge points, sorted by number of points.
- Beelener Strasse 1, 59302 OeldeDirections
- Friedhofsweg 1, 59302 OeldeDirections
- Bernhard-Raestrup-Platz 3, 59302 OeldeDirections
- Wiedenbrücker Str. 3, 59302 OeldeDirections
- Beelener Str. 11, 59302 OeldeDirections
- Marienstraße 12, 59302 OeldeDirections
- Bernhard-Rinke-Straße 13, 59302 OeldeDirections
- Albert-Einstein-Str. 14, 59302 OeldeDirections
- Münsterstr. 14, 59302 OeldeDirections
- Joan-Herman-Schwarze-Straße 15, 59302 OeldeDirections
- Warendorfer Str. 16, 59302 OeldeDirections
- Willy-Brandt-Str. 18, 59302 OeldeDirections
- Konrad-Adenauer-Allee 20b, 59302 OeldeDirections
- Vinckestr. 3, 59302 OeldeDirections
- Geiststraße 36, 59302 OeldeDirections
- Westrickweg 2, 59302 OeldeDirections
- Speckenstraße 28, 59302 OeldeDirections
- Dorfstr. 30, 59302 OeldeDirections
- Preußenweg 1, 59302 OeldeDirections
- Ludgerusstrasse 14, 59302 OeldeDirections
Recently opened
- 26 Jun 2026 · Marienstraße 12 · 22 kW · Wirelane GmbH
- 22 May 2026 · Warendorfer Str. 73-75 · 300 kW · Fred Pfennings GmbH & Co. KG
- 20 May 2026 · Carl-Haver-Platz 3 · 150 kW · Erenja AG & Co. KG
- 29 Apr 2026 · Willy-Brandt-Str. 18 · 22 kW · Wirelane GmbH
- 17 Apr 2026 · Bernhard-Rinke-Straße 13 · 22 kW · Wirelane GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Beckum 130
- Warendorf 82
- Ahlen 69
- Sendenhorst 51
- Everswinkel 42
- Drensteinfurt 35
- Ennigerloh 33
- Telgte 31
- Beelen 29
- Sassenberg 25
Data: official national charge point register (1 September 2026). Data sources