Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Warendorf · Nordrhein-Westfalen · Germany

EV charging stations in Telgte

16 public charging sites with 31 charge points are registered in Telgte, including 13 DC fast-charging points and 8 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Stadtwerke Ostmünsterland GmbH & Co. KG with 10 charge points; 8 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points31
DC fast points13
150 kW and up8

Charge points by power

≤ 11 kW2
12–22 kW16
23–49 kW0
50–149 kW3
≥ 150 kW10

Operators

Stadtwerke Ostmünsterland GmbH & Co. KG10
EnBW mobility+ AG und Co.KG6
Shell Deutschland GmbH4
Reload-Solution GmbH4
Lidl3
Knubel GmbH & Co. KG2
Berthold Tenhagen1
Helmut Scharf1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Münstertor 50, 48291 Telgte
    Shell Deutschland GmbH300 kW4 pointsCCS24/7
    Directions
  • Orkotten 40, 48291 Telgte
    EnBW mobility+ AG und Co.KG200 kW6 pointsCCS24/7
    Directions
  • Orkotten 46/48, 48291 Telgte
    Lidl60 kW3 pointsCCS, Type 2
    Directions
  • Daimlerstraße 5, 48291 Telgte
    Knubel GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Bahnweg 1, 48291 Telgte
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Am Krankenhaus 1, 48291 Telgte
    Reload-Solution GmbH22 kW2 pointsType 224/7
    Directions
  • Antoniusstr. 3, 48291 Telgte
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 2
    Directions
  • Beethovenstr. 6, 48291 Telgte
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Wöste 19, 48291 Telgte
    Reload-Solution GmbH22 kW2 pointsType 224/7
    Directions
  • Grevener Str. 30, 48291 Telgte
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Münstertor 46-48, 48291 Telgte
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Hölderlinstraße 33, 48291 Telgte
    Berthold Tenhagen11 kW1 pointsType 2
    Directions
  • Finkenweg 15a, 48291 Telgte
    Helmut Scharf11 kW1 pointsType 2
    Directions

Recently opened

  • 19 Aug 2026 · Orkotten 40 · 200 kW · EnBW mobility+ AG und Co.KG
  • 7 Jan 2026 · Münstertor 50 · 300 kW · Shell Deutschland GmbH
  • 26 Jun 2025 · Wöste 19 · 22 kW · Reload-Solution GmbH
  • 27 Nov 2024 · Am Krankenhaus 1 · 22 kW · Reload-Solution GmbH
  • 15 Aug 2024 · Beethovenstr. 6 · 22 kW · Stadtwerke Ostmünsterland GmbH & Co. KG

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET