Day-ahead today06:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Kreis Warendorf · Nordrhein-Westfalen · Germany

EV charging stations in Sendenhorst

26 public charging sites with 51 charge points are registered in Sendenhorst, including 4 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is St. Josef-Stift Sendenhorst with 28 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points51
DC fast points4
150 kW and up0

Charge points by power

≤ 11 kW0
12–22 kW46
23–49 kW4
50–149 kW1
≥ 150 kW0

Operators

St. Josef-Stift Sendenhorst28
Stadtwerke Ostmünsterland GmbH & Co. KG6
Fenster Fassade Service König GmbH5
Stadtwerke Lemgo GmbH4
Cut! Energy GmbH4
Westenergie Metering GmbH2
Knubel GmbH & Co. KG2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Teckelschlaut 9, 48324 Sendenhorst
    Fenster Fassade Service König GmbH50 kW1 pointsCCS
    Directions
  • Buschkamp 14, 48324 Sendenhorst
    Fenster Fassade Service König GmbH25 kW4 pointsCCS, Type 2
    Directions
  • Industrieweg 5, 48324 Sendenhorst
    Knubel GmbH & Co. KG22 kW2 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Westtor 7, 48324 Sendenhorst
    St. Josef-Stift Sendenhorst22 kW24 pointsType 2
    Directions
  • Dieselstr. 8, 48324 Sendenhorst
    Stadtwerke Lemgo GmbH22 kW4 pointsType 2
    Directions
  • Dieselstr. 8, 48324 Sendenhorst
    Cut! Energy GmbH22 kW4 pointsType 224/7
    Directions
  • Teckelschlaut 13, 48324 Sendenhorst
    St. Josef-Stift Sendenhorst22 kW4 pointsType 2
    Directions
  • Lambertiplatz 1, 48324 Sendenhorst
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Bergstraße 3, 48324 Sendenhorst
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Herkulesweg 4, 48324 Sendenhorst
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions
  • Schlabberpohl 6, 48324 Sendenhorst
    Stadtwerke Ostmünsterland GmbH & Co. KG22 kW2 pointsType 224/7
    Directions

Recently opened

  • 22 Dec 2025 · Dieselstr. 8 · 22 kW · Cut! Energy GmbH
  • 3 Aug 2023 · Buschkamp 14 · 25 kW · Fenster Fassade Service König GmbH
  • 1 Jan 2023 · Dieselstr. 8 · 22 kW · Stadtwerke Lemgo GmbH
  • 20 Nov 2022 · Westtor 7 · 22 kW · St. Josef-Stift Sendenhorst
  • 20 Nov 2022 · Teckelschlaut 13 · 22 kW · St. Josef-Stift Sendenhorst

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Charging stations nearby

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET