Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Leer · Niedersachsen · Germany

EV charging stations in Leer

28 public charging sites with 43 charge points are registered in Leer, including 31 DC fast-charging points and 28 delivering at least 150 kW. The most powerful points deliver up to 300 kW.

The largest operator is Tesla Germany GmbH with 16 charge points; 7 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites28
Charge points43
DC fast points31
150 kW and up28

Charge points by power

≤ 11 kW4
12–22 kW4
23–49 kW0
50–149 kW7
≥ 150 kW28

Operators

Tesla Germany GmbH16
EWE Go GmbH8
SCORE GmbH7
Aral Pulse4
Ostfriesische Beschäftigungs- und Wohnstätten GmbH4
Backcharge2
BERDING BETON GmbH2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Heisfelder Straße 212, 26789 Leer
    Aral Pulse300 kW4 pointsCCS, CHAdeMO
    Directions
  • Nüttermoorer Straße 2, 26789 Leer
    Tesla Germany GmbH250 kW16 pointsCCS
    Directions
  • Osseweg 87, 26789 Leer
    EWE Go GmbH150 kW8 pointsCCS
    Directions
  • Zoostraße 2, 26789 Leer
    SCORE GmbH75 kW7 pointsCCS, Type 2
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Ringstrasse 22, 26789 Leer
    Backcharge22 kW2 pointsType 2
    Directions
  • Eisenstraße 7a, 26789 Leer
    BERDING BETON GmbH22 kW2 pointsType 2
    Directions
  • Breslauer Straße 5, 26789 Leer
    Ostfriesische Beschäftigungs- und Wohnstätten GmbH11 kW2 pointsType 2
    Directions
  • Deichstrasse 6, 26789 Leer
    Ostfriesische Beschäftigungs- und Wohnstätten GmbH11 kW2 pointsType 2
    Directions

Recently opened

  • 15 Sept 2024 · Breslauer Straße 5 · 11 kW · Ostfriesische Beschäftigungs- und Wohnstätten GmbH
  • 15 Sept 2024 · Deichstrasse 6 · 11 kW · Ostfriesische Beschäftigungs- und Wohnstätten GmbH
  • 5 Nov 2023 · Eisenstraße 7a · 22 kW · BERDING BETON GmbH
  • 2 Aug 2023 · Osseweg 87 · 150 kW · EWE Go GmbH
  • 21 Jun 2023 · Ringstrasse 22 · 22 kW · Backcharge

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET