Day-ahead today02:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT155.6▲ +5.9%GB183.8▼ −11.5%
MethodologyAbout & contact
Landkreis Bernkastel-Wittlich · Rheinland-Pfalz · Germany

EV charging stations in Bernkastel-Kues

16 public charging sites with 31 charge points are registered in Bernkastel-Kues, including 2 DC fast-charging points. The most powerful points deliver up to 50 kW.

The largest operator is Westenergie Metering GmbH with 18 charge points; 5 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites16
Charge points31
DC fast points2
150 kW and up0

Charge points by power

≤ 11 kW1
12–22 kW28
23–49 kW0
50–149 kW2
≥ 150 kW0

Operators

Westenergie Metering GmbH18
Moselhotel Sonnenuhr GmbH6
Moselland eG - Winzergenossenschaft4
ALDI SÜD2
Charge Green OnSite GmbH1

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Cusanusstr. 18, 54470 Bernkastel-Kues
    ALDI SÜD50 kW2 pointsCCS
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Uferallee 3, 54470 Bernkastel-Kues
    Moselhotel Sonnenuhr GmbH22 kW6 pointsType 2
    Directions
  • Bornwiese 2, 54470 Bernkastel-Kues
    Moselland eG - Winzergenossenschaft22 kW4 pointsType 224/7
    Directions
  • Hinterm Graben 1, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Peter-Kremer-Weg 5, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 224/7
    Directions
  • Gestade 18, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Cusanusstraße 24 a, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Burgstraße 47 Z, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Cusanusstraße 5 z LS1, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Cusanusstraße 5Z LS2, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Damenweg 8Z LS1, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Damenweg 8z LS2, 54470 Bernkastel-Kues
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Auf der Trift 13a, 54470 Bernkastel-Kues
    Charge Green OnSite GmbH11 kW1 pointsType 2
    Directions

Recently opened

  • 7 May 2026 · Peter-Kremer-Weg 5 · 22 kW · Westenergie Metering GmbH
  • 24 Jan 2025 · Cusanusstr. 18 · 50 kW · ALDI SÜD
  • 6 Sept 2023 · Auf der Trift 13a · 11 kW · Charge Green OnSite GmbH
  • 1 Sept 2023 · Bornwiese 2 · 22 kW · Moselland eG - Winzergenossenschaft
  • 17 Feb 2023 · Uferallee 3 · 22 kW · Moselhotel Sonnenuhr GmbH

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET