Day-ahead today22:17€/MWh
NL150.4▼ −25.7%DE-LU148.6▼ −29.9%AT222.5▼ −5.6%BE152.5▼ −22.2%FR156.3▼ −3.1%PL228.6▲ +44.8%CZ202.0▼ −3.7%HU263.2▲ +4.3%SI228.6▼ −3.0%CH223.4▼ −7.0%IT-NORD234.7▼ −9.1%DK1148.0▼ −25.4%DK2149.5▼ −28.6%NO2138.5▼ −18.1%SE363.3▼ −15.3%SE4134.4▼ −5.2%ES155.6▲ +5.9%PT147.0▼ −24.8%GB207.6▲ +0.6%
MethodologyAbout & contact
Landkreis Trier-Saarburg · Rheinland-Pfalz · Germany

EV charging stations in Föhren

26 public charging sites with 51 charge points are registered in Föhren, including 4 DC fast-charging points and 3 delivering at least 150 kW. The most powerful points deliver up to 150 kW.

The largest operator is GLS Mobility GmbH with 19 charge points; 6 operators are present in total.

At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.

Sites26
Charge points51
DC fast points4
150 kW and up3

Charge points by power

≤ 11 kW13
12–22 kW34
23–49 kW0
50–149 kW0
≥ 150 kW4

Operators

GLS Mobility GmbH19
Westenergie Metering GmbH10
IT-HAUS GmbH0175186903810
Stadtwerke Trier6
Schöller Energie Holding GmbH & Co. KG4
TAS Green Energy2

Fast-charging sites

Sites with DC charge points, sorted by power.

  • Marie-Curie-Allee 10, 54343 Föhren
    Schöller Energie Holding GmbH & Co. KG150 kW4 pointsCCS, CHAdeMO24/7
    Directions

Other charging sites

AC charge points, sorted by number of points.

  • Europa-Allee 62, 54343 Föhren
    GLS Mobility GmbH22 kW16 pointsType 224/7
    Directions
  • Europa-Allee 26/28, 54343 Föhren
    IT-HAUS GmbH0175186903811 kW10 pointsType 2
    Directions
  • Europa-Allee 14, 54343 Föhren
    Stadtwerke Trier22 kW6 pointsType 224/7
    Directions
  • Im Brühl 4z, 54343 Föhren
    Westenergie Metering GmbH22 kW4 pointsType 2
    Directions
  • Bekonder Str. 24, 54343 Föhren
    GLS Mobility GmbH11 kW3 pointsType 2
    Directions
  • Flugplatz-Tower 0, 54343 Föhren
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Europa-Allee 1, 54343 Föhren
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Europa-Allee 6, 54343 Föhren
    Westenergie Metering GmbH22 kW2 pointsType 2
    Directions
  • Europaallee 62, 54343 Föhren
    TAS Green Energy22 kW2 pointsType 2
    Directions

Recently opened

  • 22 Jun 2026 · Europa-Allee 14 · 22 kW · Stadtwerke Trier
  • 7 Jan 2026 · Europa-Allee 62 · 22 kW · GLS Mobility GmbH
  • 14 Feb 2024 · Marie-Curie-Allee 10 · 150 kW · Schöller Energie Holding GmbH & Co. KG
  • 10 Aug 2023 · Bekonder Str. 24 · 11 kW · GLS Mobility GmbH
  • 1 Aug 2023 · Europa-Allee 26/28 · 11 kW · IT-HAUS GmbH01751869038

Normal and fast charging

At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.

The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.

FAQ

How much does public charging cost?
Each operator sets its own prices, which vary by charging card, app and power. Fast charging is usually more expensive. Under the EU regulation on alternative fuels infrastructure (AFIR), new charge points of 50 kW and more must accept payment by debit or credit card since April 2024.
Is charging at home cheaper?
Usually yes – especially at off-peak times or on a dynamic tariff. Our charging planner shows the cheapest hours tonight.
How up to date is the data?
We import the official register whenever a new version is published. This page does not show whether a charge point is currently free or out of order.

Data: official national charge point register (1 September 2026). Data sources

Tomorrow

Tomorrow's prices: from ~13:00 CET