EV charging stations in Idar-Oberstein
33 public charging sites with 60 charge points are registered in Idar-Oberstein, including 35 DC fast-charging points and 30 delivering at least 150 kW. The most powerful points deliver up to 300 kW.
The largest operator is EnBW mobility+ AG und Co.KG with 17 charge points; 13 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- John-F.-Kennedy-Str. 5b, 55743 Idar-ObersteinDirections
- Zwischen Wasser 13, 55743 Idar-ObersteinDirections
- Vollmersbachstr. 65, 55743 Idar-ObersteinDirections
- Fischbacher Str. 1, 55743 Idar-ObersteinDirections
- Fischbacher Str. 2, 55743 Idar-ObersteinDirections
- John-F.-Kennedy-Straße 3, 55743 Idar-ObersteinDirections
- Kaufacker 4d, 55743 Idar-ObersteinDirections
Other charging sites
AC charge points, sorted by number of points.
- Austraße 21, 55743 Idar-ObersteinDirections
- Auf der Idar 2, 55743 Idar-ObersteinDirections
- Auf der Idar 1, 55743 Idar-ObersteinDirections
- Georg-Maus-Straße 2, 55743 Idar-ObersteinDirections
- Mainzer Str. 34, 55743 Idar-ObersteinDirections
- Vollmersbachstraße 71, 55743 Idar-ObersteinDirections
- Bahnhofstraße 20Z, 55743 Idar-ObersteinDirections
- Zwischen Wasser 13, 55743 Idar-ObersteinDirections
- Zur Rothheck 3, 55743 Idar-ObersteinDirections
- Käseicher Weg 4, 55743 Idar-ObersteinDirections
Recently opened
- 29 Jul 2026 · Fischbacher Str. 1 · 300 kW · Aral Pulse
- 12 Nov 2025 · John-F.-Kennedy-Straße 3 · 200 kW · EnBW mobility+ AG und Co.KG
- 22 Jul 2025 · Vollmersbachstr. 65 · 300 kW · EnBW mobility+ AG und Co.KG
- 2 Jul 2025 · Zwischen Wasser 13 · 300 kW · EnBW mobility+ AG und Co.KG
- 5 Feb 2025 · Auf der Idar 2 · 22 kW · Kreissparkasse Birkenfeld, Anstalt des öffentlichen Rechts
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bernkastel-Kues 31
- St. Wendel 49
- Simmern 42
- Landstuhl 32
- Rheinböllen 29
- Bad Kreuznach 153
- Kaiserslautern 354
- Wittlich 96
- Föhren 51
- Neunkirchen 68
- Homburg 132
- Gensingen 63
Data: official national charge point register (1 September 2026). Data sources