EV charging stations in Wittlich
64 public charging sites with 96 charge points are registered in Wittlich, including 66 DC fast-charging points and 56 delivering at least 150 kW. The most powerful points deliver up to 400 kW.
The largest operator is Tesla Germany GmbH with 22 charge points; 18 operators are present in total.
At home, a kilowatt-hour costs about €0.390/kWh on average today (estimated final price on a dynamic tariff) – roughly €6.63 for 100 km at 17 kWh.
Charge points by power
Operators
Fast-charging sites
Sites with DC charge points, sorted by power.
- Friedrichstr. 58, 54516 WittlichDirections
- Straßburgstraße 4, 54516 WittlichDirections
- Friedrichstraße 59, 54516 WittlichDirections
- Hof Breit 0, 54516 WittlichDirections
- Justus-von-Liebig-Str. 0, 54516 WittlichDirections
- Rudolf-Diesel-Str. 15, 54516 WittlichDirections
- Justus-von-Liebig-Str. 4, 54516 WittlichDirections
- Hof Breit 0, 54516 WittlichDirections
- Gerberstr. 0, 54516 WittlichDirections
- Gottlieb-Daimler-Straße 10, 54516 WittlichDirections
- Kurfürstenstr. 16, 54516 WittlichDirections
- Kurfürstenstr. 69, 54516 WittlichDirections
Other charging sites
AC charge points, sorted by number of points.
- Feldstr. 0, 54516 WittlichDirections
- Kurfürstenstr. 1, 54516 WittlichDirections
- Dr. Oetker Str. 1, 54516 WittlichDirections
- Karrstr. 1, 54516 WittlichDirections
- Justis-von-Liebig-Straße 4, 54516 WittlichDirections
- Rudolf Diesel Str. 9, 54516 WittlichDirections
- Rudolf Diesel Straße 9, 54516 WittlichDirections
- Schloßstr. 11, 54516 WittlichDirections
- Talweg 24, 54516 WittlichDirections
- Römerstraße 59, 54516 WittlichDirections
- Himmeroder Str. 88, 54516 WittlichDirections
- Max-Planck-Straße 4, 54516 WittlichDirections
- Max-Planck-Str. 21, 54516 WittlichDirections
- Hofstraße 11, 54516 WittlichDirections
- Im Giehren 17, 54516 WittlichDirections
Recently opened
- 20 May 2026 · Feldstr. 0 · 22 kW · Westenergie Metering GmbH
- 20 May 2026 · Karrstr. 1 · 22 kW · Westenergie Metering GmbH
- 20 May 2026 · Schloßstr. 11 · 22 kW · Westenergie Metering GmbH
- 20 May 2026 · Talweg 24 · 22 kW · Westenergie Metering GmbH
- 20 May 2026 · Himmeroder Str. 88 · 22 kW · Westenergie Metering GmbH
Normal and fast charging
At AC charging points (usually a Type 2 socket) cars charge at 7, 11 or 22 kW – enough for a stay of a few hours. DC fast chargers (CCS connector) deliver 50 kW and more; at hubs with 150 kW and up, a mid-size car regains most of its range in 20 to 30 minutes.
The figures come from the official national register, to which operators report their publicly accessible charge points. Not every point is listed straight away, so the real number is slightly higher.
EV charging planner: find the cheapest time to charge EV charging stations in Germany
FAQ
How much does public charging cost?
Is charging at home cheaper?
How up to date is the data?
Charging stations nearby
- Bernkastel-Kues 31
- Föhren 51
- Daun 34
- Bitburg 47
- Trier 199
- Gerolstein 36
- Nürburg 42
- Prüm 30
- Baar 32
- Idar-Oberstein 60
- Mayen 57
- Simmern 42
Data: official national charge point register (1 September 2026). Data sources